Laserfiche WebLink
VmeO <br />Completed Phase 5 VLF Underground Workings <br />12/12/2009 <br />ID# <br />Northing <br />Easting <br />Elevation <br />Comments <br />3001 <br />52251.480 <br />37816.280 <br />9736.900 <br />Remediation Complete <br />3004 <br />51832.108 <br />38288.165 <br />9758.465 <br />Remediation Complete <br />3002 <br />50199.458 <br />40213.670 <br />10174.951 <br />Working not within the Phase 5 VLF footprint. No remediation necessary <br />3003 <br />49681.855 <br />39111.850 <br />10222.514 <br />Working not within the Phase 5 VLF footprint. No remediation necessary <br />3005 <br />49798.380 <br />39013.070 <br />10132.900 <br />Working removed during cut. Remediation complete. <br />3008 <br />51975.100 <br />37884.300 <br />Pending <br />Working backfilled. Geo rid cap placed and remediation complete. <br />Pending Phase 5 VLF Underground Workings <br />12/12/2009 <br />ID# <br />Northing <br />Easting <br />Elevation <br />Comments <br />3006 <br />51789.000 <br />37851.200 <br />Pending <br />Confirmatory drilling in progress. <br />3007 <br />51847.00 <br />37844.800 <br />Pending <br />Confirmatory drilling in progress. <br />3009 <br />51870.100 <br />37736.800 <br />Pending <br />Working will be inspected and remediated after cut in area is performed. <br />PHOTOGRAPHS, WEEK ENDING DECEMBER 12, 2009 <br />Photo #1: December 10 '09; JDH: AMEC representative monitoring existing fill temperature <br />VLF Weekly Report WE 12.12.09.D.doc <br />