Laserfiche WebLink
r <br />ameck, Irth & Environal <br />Location <br />Week <br />tons <br />Cumulative <br />Comments <br />E Cresson Clay Processing <br />13,097 <br />18,485 <br />S Cresson Clay Processing <br />0 <br />201,199 <br />Processing in area complete. <br />Squaw Gulch Processing <br />0 <br />35,816 <br />Processing in area complete. <br />Total <br />13,097 <br />243,501 <br />2) Low Volume Solution Collection Fill Material ( LVSCF) <br />Processing of Low Volume Solution Collection Fill material continued at the Dump 4 LVSCF <br />Process. A CAT D -10 dozer and a skid steer loader were used to process the material. <br />Location <br />hi <br />�onmulative <br />Comments <br />sWeek <br />Dump 4 LVSCF Processing <br />13,097 <br />1 136,673 <br />G) Miscellaneous <br />No work was performed during the week. <br />III) Underground Workings <br />A) Drilling/Excavation <br />No work was performed during the week. <br />B) Mine Shaft /Stope Remediation <br />Grouting of miss (no void) holes was performed at Underground Workings #3012. <br />Blasting of the crown pillar at Underground Working #3012 was performed. Temporary fill is <br />necessary in the area to continue confirmatory drilling east of the working, up the slope. The <br />temporary fill and material in the working will be excavated and the working will be remediated <br />per plan when confirmatory drilling is complete. <br />C) Lateral/Slot Remediation <br />No work was performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work was performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation was not substantial throughout the <br />week. <br />Storm water controls are being constructed in the East Cresson Clay Borrow as needed. <br />VLF Weekly Report WE 02.20.10.D.doc <br />