Laserfiche WebLink
a <br />F.+.7 A ..n,.:--ml.. <br />ATTACHMENT A <br />2009 CQA FIELD STAFF SCHEDULE FOR AMEC PERSONNEL <br />PHASE 5 VLF <br />Name <br />DEC -13 <br />DEC -14 <br />DEC -15 <br />DEC -16 <br />DEC -17 <br />DEC -18 <br />DEC -19 <br />Joseph Hickey <br />- <br />- <br />PR <br />- <br />- <br />- <br />- <br />Steve Rice <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Steve Marquez <br />ST <br />ST <br />ST <br />ST <br />- <br />Tyler Wendlandt <br />- <br />ST <br />ST <br />ST <br />ST <br />ST <br />- <br />John Lupo <br />- <br />- <br />- <br />PCE <br />- <br />- <br />- <br />Derek Wittwer <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />LEGEND <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />VLF Weekly Report WE 12.19.09.D.doc <br />