My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 3:01:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 (continued) 2011 phase 5 valley leach facility ore storage 2 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
432
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ame& <br />B) Mine Shaft/Stope Remediation <br />No work performed during the week. <br />C) Lateral/Slot Remediation <br />No work performed during the week. <br />IV) Storm Water Management Structures <br />A) Control Structures <br />No work performed during the week. <br />B) Best Management Practices <br />Best Management Practices are being observed throughout the Phase 5 VLF Project. Storm water <br />controls were maintained throughout the week. Precipitation not substantial throughout the week. <br />V) VLF Primary Underdrain <br />No work performed during the week. <br />VI) Miscellaneous <br />Underdrain filter material stockpiled at the 5 -way intersection was hauled to various stockpile areas <br />around the construction site. This was performed using CAT 777 haul trucks loaded by a John Deere <br />850 excavator. Relocating the material was performed to allow the Mine Operations to build a road in <br />the area. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed and documented ambient and fill temperatures, as well as the placement of structural fill <br />within the Phase 5 VLF fill area. <br />AMEC observed and documented ambient and fill temperatures, as well as the structural fill placement <br />(processed ore) within the Phase IV VLF constantly. Nuclear density testing was performed during <br />placement. <br />AMEC observed construction of the ADR/Crushing waterlines. <br />AMEC observed confirmation drilling at Underground Workings #3006, #3007, and #3009 constantly. <br />Testing Summary <br />Laboratory testing continues (Particle Size Distribution, Atterberg Limits, and Moisture - Density <br />Compaction testing) for sampled materials. <br />VLF Weekly Report WE 12.19.09.D.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.