Laserfiche WebLink
amec <br />Earth & Environmental <br />VLF EARTHWORKS FIELD MONITORING SUMMARY (WEEKLY REPORT) <br />Project Title: CC &V/ Phase 5 Project No.: 8420125EO <br />Owner: Cripple Creek & Victor Gold Mining Co. Contractor: Ames Construction Co., Inc. <br />Location: Cripple Creek & Victor Gold Mine <br />Work Element: Phase 5 CQA/ VLF <br />Date: 1/27/09 Reporting Period: 01/18/09 through 01/24/09 <br />Days <br />S <br />M <br />I T <br />W <br />T <br />F <br />S <br />Work Shifts <br />- <br />D <br />D <br />D <br />D <br />D <br />- <br />D = Day Shift N = Night Shift <br />Ambient Temperature Range (F): Lows: 17 'to 41° Highs: 51° to 70° <br />AMEC CQA Personnel On -site through the Reporting Period (See Attachment A). <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />NO CONSTRUCTION ACTIVITY ON THE VLF THIS WEEK <br />I. EARTHWORKS <br />A. Clear and Grubbing <br />1. VLF <br />• No activities <br />2. Sediment Collection Pond <br />• No Activities. <br />B. Stripping <br />1. VLF <br />• No Activities. <br />2. Sediment Collection Pond <br />• No Activities <br />C. Waste Rock to Stockpile <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />• No Activities <br />D. Cut to Fill <br />1. VLF <br />• No Activities <br />2. Sediment Collection Pond <br />Sheet 1 of 4 VLF Weekly Report WE 01.24.09.D.doc <br />