My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />2011 Phase 5 VLF OSA 3rd Portion <br />Photograph Log <br />ameO <br />Photo <br />Number <br />Date <br />Description <br />1 <br />September 1, 2009 <br />Subgrade preparation prior to Structural Fill placement <br />2 <br />September 15, 2009 <br />Performing a large rock gradation for Structural Fill material <br />3 <br />September 25, 2009 <br />Structural Fill placement <br />4 <br />October 1, 2009 <br />Processing Soil Liner Fill material <br />5 <br />October 18, 2010 <br />Soil Liner Fill placement <br />6 <br />October 23, 2010 <br />Geomembrane deployment <br />7 <br />November 8, 2010 <br />Anchor trench backfill <br />8 <br />November 12, 2010 <br />Drain Cover Fill placement <br />9 <br />April 13, 2011 <br />Slope contouring <br />10 <br />May 23, 2011 <br />Inventory and inspection of geomembrane delivered to site <br />11 <br />August 29, 2011 <br />Moisture conditioning and finishing placed Soil Liner Fill <br />12 <br />August 31, 2011 <br />Anchor trench backfill <br />13 <br />September 6, 2011 <br />Soil Liner Fill testing and test location survey <br />14 <br />September 10, 2011 <br />Geomembrane extrusion seaming <br />15 <br />September 12, 2011 <br />Geomembrane deployment <br />16 <br />September 13, 2011 <br />Soil Liner Fill compaction <br />17 <br />September 17, 2011 <br />Drain Cover Fill placement <br />18 <br />September 18, 2011 <br />Anchor trench excavation <br />19 <br />September 20, 2011 <br />Leak detection system installation <br />20 <br />September 21, 2011 <br />Geogrid installation <br />21 <br />September 26, 2011 <br />Containment berm installation <br />22 <br />September 27, 2011 <br />Soil Liner Fill placement <br />23 <br />October 4, 2011 <br />Geomembrane vacuum testing <br />24 <br />October 5, 2011 <br />Drain Cover Fill placement <br />25 <br />October 10, 2011 <br />Snow removal <br />26 <br />October 14, 2011 <br />Geomembrane fusion seaming <br />27 <br />October 21, 2011 <br />Geomembrane fusion seam pressure testing <br />28 <br />October 24, 2011 <br />Geomembrane repair activities <br />29 <br />November 3, 2011 <br />1 Drain Cover Fill placement <br />30 <br />November 11, 2011 <br />1 Drain Cover Fill placement <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.