My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-11-19_REPORT - M1980244 (2)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2011-11-19_REPORT - M1980244 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:45:10 PM
Creation date
2/26/2014 2:28:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
11/19/2011
Doc Name
FINAL REPORT, VOLUME 2 OF 3 2011 phase 5 valley leach facility ore storage 1 OF 3
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
403
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Miring Company ameO <br />2011 Phase 5 VLF OSA 3r Portion <br />March 2010 CQA Field Staff Schedule for AMEC Personnel <br />Name <br />3/1 <br />312 <br />3/3 <br />3/4 <br />3/5 <br />3/6 <br />317 <br />3/8 <br />3/9 <br />3/10 <br />3/11 <br />3/12 <br />3/13 <br />3/14 <br />3/15 <br />3/16 <br />3117 <br />3118 <br />3/19 <br />3/20 <br />3121 <br />3/22 <br />3124 <br />3125 <br />3/26 <br />3/27 <br />3/28 <br />3/29 <br />3/30 <br />3/31 <br />Joseph Hickey <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />- <br />- <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />Steve Rice <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />*LS <br />*LS <br />*LS <br />*LS <br />LS <br />F/2 <br />LS <br />LS <br />LS <br />LS <br />LS <br />LS <br />Mike Glass <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />LG <br />Alfonso Frias <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Benjamin Mell <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />GT <br />Tyler Wendlandt <br />*ST <br />*ST <br />*ST <br />I *ST <br />*ST <br />I <br />*ST <br />I *ST <br />I *ST <br />*ST <br />*ST <br />*ST <br />*ST <br />*ST <br />*ST <br />*ST <br />*ST <br />*ST <br />Madison Crouch <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />LT <br />Brian Nelson <br />- <br />- <br />- <br />LT <br />LT <br />LT <br />John Lupo <br />I <br />I tl <br />I PCE <br />Kevin Engelmeier <br />I <br />I - <br />I FLM <br />I FLM <br />I FLM <br />FLM <br />LM <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />Page 3 of 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.