Laserfiche WebLink
Cripple Creek & Victor Gold Miring Company ameO <br />2011 Phase 5 VLF OSA 3 rd Portion <br />February 2009 CQA Field Staff Schedule for AMEC Personnel <br />Name <br />-Hickey <br />2/1 <br />2/2 <br />2/3 <br />2/4 <br />2/5 <br />2/6 <br />217 <br />2/8 <br />2/9 <br />2/10 <br />2/11 <br />2/12 <br />2/13 <br />2/14 <br />2/15 <br />2/16 <br />2/17 <br />2/18 <br />2/19 <br />2/20 <br />2/21 <br />2122 <br />2/23 <br />2/24 <br />2/25 <br />2/26 <br />2/27 <br />2/28 <br />Joe <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />LS <br />LS <br />LS <br />LS <br />LS <br />- <br />Steve Rice <br />PR <br />PR <br />PR <br />PR <br />PR <br />Alfonso Frias <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />OR <br />Gar Salisbu <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />ST <br />Joe Namlick <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />PR <br />John Lupo <br />PCE <br />- <br />Derek Wittwer <br />PM <br />PM <br />PM <br />M <br />PS = Project Sponsor <br />PCE = Project Certifying Engineer <br />PM = Project Manager <br />PR = Project Resident <br />LS = Lead Soils Engineer <br />LG = Lead Geosynthetics Engineer <br />ST = Soil Technician <br />LT = Laboratory Technician <br />GT = Geosynthetics Technician <br />FLM= Field/ Laboratory Manager <br />SE = Senior Engineer <br />Par 12 <br />