My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-07-07_REPORT - M1980244 (6)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2009-07-07_REPORT - M1980244 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 3:48:33 PM
Creation date
2/26/2014 9:30:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
7/7/2009
Doc Name
QA July 7,2009: Load out Bin Relpcation Doc 1 of 7
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />Table of Contents (Continued) <br />"wil =',I <br />Appendix G <br />Subgrade Acceptance Forms <br />Appendix H <br />CQA Laboratory Test Results <br />Appendix H -1 <br />Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix H -2 <br />Compaction Tests <br />Appendix H -3 <br />Soil Liner Fill Permeability Tests <br />Appendix I <br />Geomembrane Quality Control Documents and Inventory <br />Appendix 1 -1 <br />Geomembrane Inventory Control <br />Appendix 1 -2 <br />Resumes of Installation Personnel <br />Appendix 1 -3 <br />Geomembrane Resin Quality Control Certificates <br />Appendix 1 -4 <br />Geomembrane Roll Quality Control Certificates <br />Appendix 1 -5 <br />Welding Rod Quality Control Certificates <br />Appendix J <br />Geomembrane Installation Observations <br />Appendix J -1 <br />Geomembrane Deployment Observations <br />Appendix J -2 <br />Geomembrane Trial Seam Summaries <br />Appendix J -3 <br />Geomembrane Fusion Welding Summary <br />Appendix J -4 <br />Geomembrane Extrusion Welding Summary <br />Appendix J -5 <br />Geomembrane Defect/Repair Summary <br />Appendix J -6 <br />Geomembrane Non - Destructive Testing Summaries <br />Appendix J -7 <br />Geomembrane Destructive Testing Summaries <br />Appendix K <br />Conformance Test Results <br />Appendix L <br />Tensiometer Certification <br />SIPROJECTS \1125E CCV CQA \H3 - CONSTRUCTION \LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.01.DOC Iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.