Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Load Out Bin Relocation <br />July 7, 2009 <br />Table of Contents (Continued) <br />"wil =',I <br />Appendix G <br />Subgrade Acceptance Forms <br />Appendix H <br />CQA Laboratory Test Results <br />Appendix H -1 <br />Grain Size Distribution, Moisture Content and Atterberg Limits <br />Appendix H -2 <br />Compaction Tests <br />Appendix H -3 <br />Soil Liner Fill Permeability Tests <br />Appendix I <br />Geomembrane Quality Control Documents and Inventory <br />Appendix 1 -1 <br />Geomembrane Inventory Control <br />Appendix 1 -2 <br />Resumes of Installation Personnel <br />Appendix 1 -3 <br />Geomembrane Resin Quality Control Certificates <br />Appendix 1 -4 <br />Geomembrane Roll Quality Control Certificates <br />Appendix 1 -5 <br />Welding Rod Quality Control Certificates <br />Appendix J <br />Geomembrane Installation Observations <br />Appendix J -1 <br />Geomembrane Deployment Observations <br />Appendix J -2 <br />Geomembrane Trial Seam Summaries <br />Appendix J -3 <br />Geomembrane Fusion Welding Summary <br />Appendix J -4 <br />Geomembrane Extrusion Welding Summary <br />Appendix J -5 <br />Geomembrane Defect/Repair Summary <br />Appendix J -6 <br />Geomembrane Non - Destructive Testing Summaries <br />Appendix J -7 <br />Geomembrane Destructive Testing Summaries <br />Appendix K <br />Conformance Test Results <br />Appendix L <br />Tensiometer Certification <br />SIPROJECTS \1125E CCV CQA \H3 - CONSTRUCTION \LOB CERT REPORT\REPORT BODY\LOB CERT REPORT 2009.07.01.DOC Iv <br />