My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - m1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - m1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:42 PM
Creation date
2/26/2014 9:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
QA REPORT Phase 4B/C Triangle Liner Certification Aug 10, 2010
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
amel <br />�..;�it, A. <br />Summary of Planning Items: <br />Continue placing structural fill within the Phase 5 VLF footprint. <br />Continue processing SLF material at the East Cresson Clay Borrow. <br />Continue processing LVSCF at the Dump 4. <br />Continue receiving geomembrane to site. <br />Continue exposure of the Phase IV geomembrane. <br />Continue subgrade preparation for SLF placement. <br />Continue SLF placement within the Phase 5 VLF footprint. <br />Begin secondary geomembrane installation within the Phase 5 VLF footprint. <br />Summary of Non- conformances: <br />None Issued <br />Summary of Meetings and Discussions: <br />CC& V. <br />CC &V held a Weekly Construction meeting on May 4, 2010. Items discussed included Safety, <br />Environmental, Schedule, QC documentation, and CQA. <br />Ames Construction: <br />None <br />AMEC: <br />Derek Wittwer (Project Manager- 5/4/2010) and Jay Moore (Senior Engineer- 5/6/2010) were on -site to <br />observe /discuss project activities, progress, and scheduling. <br />Others: <br />None <br />Summary of Incidents /Accidents /Health & Safety Issues: <br />None <br />We trust the information provided clearly represents our findings and observations for the week ending <br />May 8, 2010. <br />Joseph D. Hickey, CQA Monitor <br />Approved By: t1-) 4/L <br />Date: May 8, 2010 <br />Date: 'Y// 2, <br />. e <br />VLF Weekly Report WE 05.08.1 O.D <br />
The URL can be used to link to this page
Your browser does not support the video tag.