My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - m1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - m1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:42 PM
Creation date
2/26/2014 9:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
QA REPORT Phase 4B/C Triangle Liner Certification Aug 10, 2010
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project ameO <br />Quality Assurance Monitoring and Test Results <br />Phase 4B /C Triangle Liner Certification <br />August 10, 2010 <br />List of Tables <br />Table 1 Summary of Earthworks Material Specifications <br />Table 2 <br />Summary of Weather Data <br />Table 3 <br />Earthworks CQA Test Summary and Testing Frequency <br />Table 4 <br />Phase 413/4C Triangle Soil Liner Fill Laboratory Testing Summary <br />Table 5 <br />Phase 413/4C Triangle Drain Cover Fill Laboratory Testing Summary <br />Table 6 <br />Phase 413/4C Triangle Nuclear Density Laboratory Testing Summary <br />Table 7 <br />Phase 4B/4C Triangle Soil Liner Fill Depth Verification <br />List of Figures <br />Figure 1 Certification Area <br />Figure 2 Destructive Sample Test Codes for Extrusion Welds with Leister Heat Seams <br />Figure 3 Destructive Sample Test Codes for Dual Hot Wedge Fusion Welds <br />Figure 4 Phase 413/4C SLF Layout <br />Figure 5 Phase 413/4C Triangle Panel Layout <br />Figure 6 Phase 413/4C DCF Layout <br />List of Appendices <br />Appendix A Photographic Documentation <br />Appendix B Staff Schedule for Personnel <br />Appendix C Weekly Reports <br />Appendix D Technical Specifications <br />Appendix E <br />Subgrade Acceptance Forms <br />Appendix F <br />CQA Laboratory Test Results <br />Appendix G <br />Geomembrane Quality Control Documents and Inventory <br />Appendix G -1 <br />Geomembrane Inventory Control <br />Appendix G -2 <br />Resumes of Installation Personnel <br />Appendix G -3 Geomembrane Resin Quality Control Certificates <br />Appendix G -4 Geomembrane Roll Quality Control Certificates <br />Appendix G -5 Welding Rod Quality Control Certificates <br />Appendix H Geomembrane Installation Observations <br />Appendix H -1 Geomembrane Deployment Observations <br />Appendix H -2 Geomembrane Trial Seam Summaries <br />Appendix H -3 Geomembrane Fusion and Extrusion Welding Summaries <br />S \PROJECTS \1125E CCV CQA \H2 - DESIGN \TRIANGLE \FINAL \TRIANGLE CERTIFICATION REPORT FINAL REV1 DOC <br />
The URL can be used to link to this page
Your browser does not support the video tag.