My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-08-10_REPORT - m1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2010-08-10_REPORT - m1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:17:42 PM
Creation date
2/26/2014 9:22:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1980244
IBM Index Class Name
REPORT
Doc Date
8/10/2010
Doc Name
QA REPORT Phase 4B/C Triangle Liner Certification Aug 10, 2010
From
CC&V
To
DRMS
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 4B /C Triangle Liner Certification <br />August 10, 2010 <br />Ames processed the SLF for the Phase 4B/4C Triangle construction as part of the Phase 5 <br />construction activities. Ames worked the borrow material through a rotary mill and screen to <br />remove oversized material from the SLF and to uniformly condition the material prior to <br />stockpiling. <br />The SLF was compacted to a minimum thickness of 12 inches by a smooth -drum vibratory <br />compactor. AMEC observed SLF depth verification tests performed by Ames to confirm <br />appropriate fill depth. Any areas that were found to be deficient in thickness were reworked and <br />retested until the area met specifications. The SLF depth verification is discussed in <br />Section 4.2.3. SLF was moisture - conditioned and compacted as needed to meet project <br />specifications. The minimum SLF density was 95 percent of the maximum dry density at <br />optimum moisture content to 3 percent wet of optimum as determined by standard Proctor tests <br />performed by AMEC. Areas of the SLF that initially failed to meet the moisture - density <br />requirement were moisture - conditioned, if necessary, and re- compacted to achieve the required <br />compaction. <br />Prior to geomembrane deployment on the SLF, Ames proof - rolled, compacted, and <br />hand - worked the fill surface to be free of desiccation cracks and abrupt grade changes. AMEC <br />then inspected the surface. Sharp or angular stones greater than 0.75 inches in diameter were <br />removed from the finished surface. AMEC approved fill surfaces prior to release to Lonestar <br />(Geomembrane Subcontractor to Ames) for deployment. AMEC provided formal subgrade <br />approval prior to geomembrane deployment. The subgrade acceptance forms are presented in <br />Appendix E. The SLF layout is shown on Figure 4. <br />2.3 Geomembrane Liner <br />A single geomembrane composite liner system was installed in the Phase 413/4C Triangle area. <br />The composite liner system consists of a minimum of 12 inches of compacted SLF overlain by a <br />single layer consisting of 100 -mil single sided texture LLDPE geomembrane. <br />Ames anchored geomembrane at the limits of the Phase 413/4C Triangle area in a 3 feet deep <br />by 2 feet wide anchor trench. Ames backfilled the anchor trenches with suitable anchor trench <br />backfill material. Ames placed anchor trench backfill in maximum 12- inch -thick compacted lifts. <br />Anchor trench backfill was compacted with "Jumping Jacks." The geomembrane liner <br />overlapped and was extrusion welded to the Phase IV VLF liner system, as detailed in Phase 5 <br />IFC Drawing No. A250. The geomembrane as -built panel layout is shown on Figure 5. <br />Upon completion, a 2 -foot layer of DCF was then placed over the geomembrane. <br />S \PROJECTS \1125E CCV CQA \H2 - DESIGN \TRIANGLE \FINAL \TRIANGLE CERTIFICATION REPORT FINAL REV1 DOC 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.