Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Cresson Project <br />Quality Assurance Monitoring and Test Results <br />Phase 46 /C Triangle Liner Certification <br />August 10, 2010 <br />1.4 Certification Boundary <br />Figure 1 presents the boundary of the areas being certified in this report. The work completed <br />within the certification boundary included site grading; subgrade preparation; SLF installation, <br />placement and compaction; installation of 100 -mil single sided texture LLDPE geomembrane; <br />and DCF placement. <br />S \PROJECTS \1125E CCV CQA \H2 - DESIGN \TRIANGLE \FINAL \TRIANGLE CERTIFICATION REPORT FINAL REW DOC 4 <br />