Laserfiche WebLink
October 2001 -33- 003-2182.004 <br /> 7.0 CONCLUSIONS <br /> In accordance with our responsibilities as the Project Engineer and as the Quality Assurance <br /> Consultant for the External Pond Construction, and per the requirements of the various <br /> applicable DMG approvals, Golder Associates Inc. (Golder) attests that it observed and <br /> performed the required Construction Quality Assurance activities during construction of the <br /> referenced facility. Based on daily communications with Golder personnel, on observations <br /> made during on-site visits, and on review of the laboratory and field test results, Golder attests <br /> that the External Pond Construction was performed in compliance with the design plans and <br /> specifications as described in this document and as approved by DMG. <br /> Sincerely, <br /> GOLDER ASSOCIATES INC. <br /> Robert Nichols <br /> Resident Engineer <br /> rfJo Fin . Lupo,Ph.D., P.E. <br /> ! Y Certifying Engineer <br /> James M. Johnson,P.E. <br /> Principal <br /> RN/JFL/JMJ/llr <br /> I\00\2182\EXTERNAL POND RVARNAL DOC Golder Associates <br />