My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2001-10-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 1:56:35 PM
Creation date
2/25/2014 5:46:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/25/2001
Doc Name
Final Report QA Oct 2001for "External Pond" Doc 1 of 10
From
CC&V
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2001 -24- 003-2182.004 <br /> 6.1.1 Conformance Testing <br /> A Golder representative performed geomembrane conformance sampling at the Poly-Flex <br /> plant in Grand Prairie, Texas. Samples were sent to Golder's geosynthetic laboratory in <br /> Duluth, Georgia, for conformance testing. Geomembrane rolls were not used on the project <br /> unless approved by Golder based on conformance test results. <br /> Prior to LLDPE and HDPE geomembrane arrival to site, Golder performed seven <br /> conformance tests at a frequency of one test per 95,000 square feet and one test per 44,000 <br /> square feet, respectively, exceeding the minimum specified testing frequencies of one test per <br /> 150,000 square feet. <br /> Conformance testing for the geomembrane delivered to the site met specifications. Results <br /> are presented in Appendix J-1. <br /> 6.1.2 Deployment Monitoring <br /> Geomembrane panel deployment monitoring performed by Golder included: <br /> ► Observation of panel surface condition and panel overlap; <br /> ► Assignment of panel numbers; <br /> ► Verification of factory roll number and receipt of complete certification <br /> prior to allowing deployment; <br /> ► Measurement of sheet thickness; <br /> ► Documentation of deployed panel lengths; and <br /> ► Development of panel layout record drawing; <br /> I\00\2182\EXTEMAL POND"TPINAL DOC Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.