My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-10-25_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2001-10-25_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2021 1:56:35 PM
Creation date
2/25/2014 5:46:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
10/25/2001
Doc Name
Final Report QA Oct 2001for "External Pond" Doc 1 of 10
From
CC&V
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 2001 -21- 003-2182.004 <br /> 5.0 GEOSYNTHETICS CQC SUBMITTALS <br /> Geosynthetics Construction Quality Control (CQC) submittals reviewed by Golder included <br /> installation personnel resumes, geomembrane resin certificates, geomembrane roll certificates, <br /> welding rod resin certificates, tensiometer certifications and geonet certificates. Golder's <br /> inventory control, summarizing CQC certification received for each roll of geomembrane used <br /> for the External Pond liner system, is presented in Appendix I-1. <br /> 5.1 Geomembrane Installation Personnel Resumes <br /> Golder reviewed the resumes of Poly-Flex installation personnel to verify that the installation <br /> superintendent and the seaming personnel possessed sufficient experience as required by the <br /> project specifications. Review of the installation personnel resumes indicated that key <br /> personnel had experience sufficient to meet or exceed project specifications. Geomembrane <br /> personnel resumes are presented in Appendix I-2. <br /> 5.2 Geomembrane CQC Documents <br /> CQC documents submitted by Poly-Flex included resin supplier certificates and geomembrane <br /> manufacturer resin certificates, geomembrane roll certificates, and welding rod resin <br /> certificates. Golder reviewed CQC documents prior to geomembrane placement and verified <br /> that the documentation was complete and that the material properties and CQC testing <br /> frequency required by specifications were met. <br /> 5.2.1 Resin COC Certificates <br /> LLDPE polymer raw material (resin) CQC certificates were provided by the resin manufacturer, <br /> Phillips Chemical Company, at a frequency of one per rail car shipment. Golder reviewed these <br /> certificates prior to geomembrane placement. The geomembrane manufacturer also performed <br /> I%00\21sz\EXTER AL POND"TTINAL DOD Golder Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.