My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2000-02-10_REPORT - M1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2000-02-10_REPORT - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/26/2021 5:20:51 PM
Creation date
2/25/2014 4:47:34 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/10/2000
Doc Name
CQA Rpt for 1999 acitivites at "Load Out Bin" area of VLF
From
CC&V
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GEOMEMBRANE DEFECT AND REPAIR SUMMARY <br /> LOB LINER EXPANSION <br /> DEFECT REPAIR VACUUM TEST <br /> DEFECT DEFECT SEAM,PANEL DEFECT LOCATION DEFECT REPAIR SIZE WELD GUN TEST QA <br /> CODE DATE NUMBER DESCRIPTION TYPE DATE TECH NO. DATE MON. <br /> LOB-A 10/25/99 LOB 1/2/3 INTERSECTION T 10/25/99 4 x 2 CJ 9 10/25/99 WH <br /> LOB-B 10/25/99 LOB 2 SOUTHEAST CORNER WR 10/25/99 2 x 2 CJ 9 10/25/99 CDM <br /> LOB-C 10/25/99 LOB 1/2/EP INTERSECTION T 10/25/99 1 x 1 CJ 9 10/25/99 CDM <br /> LOB-D 10/25/99 LOB 1/EP NORTHEAST CORNER EXT 10/25/99 3 x 3 CJ 9 10/25/99 CDM <br /> LOB-E 10/25/99 LOB 1/2 20' EAST OF WEOS DS 10/25/991 4 x 2 CJ 9 10/25/99 CDM <br /> LOB-F 10/25/99 LOB 2/EP 20' EAST OF WEOS DX 10/25/99 4 x 2 CJ 9 10/25/99 CDM <br /> 1. Defect Location Description Codes: 2. Defect Type Codes: <br /> EXIST = Existing Phase I Geomembrane BO = Fusion Welder Burn <br /> EEO = east end of DS-N =Fusion Destructive Test Number <br /> WEO = west end of DSX-N = Extrusion Destructive Test Number <br /> SEO = south end of CR = Crease <br /> NEO = north end of D = Installation Damage <br /> S = seam(e.g.,EEOS = east end of seam) EXT = Extension <br /> P = panel(e.g. NEOP = north end of panel) FS = Failed Seam Length <br /> EAT = east anchor trench IO = Insufficient Overlap <br /> NAT = north anchor trench PT = Pressure Test Cut <br /> WAT = west anchor trench SI = Soil Surface Irregularity <br /> SAT = south anchor trench T = Three Panel Intersection <br /> VL = Vacuum Test Leak <br /> WR = Wrinkle <br /> WS =Welder Restart <br /> January 20W <br /> 1199R011/1260/LOB/Dcfmt x1i Golder Associates 993-2011 <br />
The URL can be used to link to this page
Your browser does not support the video tag.