Laserfiche WebLink
GEOMEMBRANE SEAM SUMMARY-FUSION WELDING <br /> LOB LINER EXPANSION <br /> SEAM SEAM DATE START AMBIENT WELD MACHINE MACHINE MACHINE TEMP. SEAM MONITOR DESTRUCTIVE <br /> NO. SECTION TIME AIR TECH. NO.: SETTING SETTING ,ACTUAL .LENGTH <br /> TEMP. WELDED ;° <br /> LOB 1/2 SEOS TO NEOS 10/23/99 17:13 40 SR 43 5.5 750 749 40 WH LOB-DS-1 <br /> LOB 1/3 WEOS TO EEOS 10/23/99 17:25 40 SR 43 5.5 750 749 13 WH <br /> LOB 2/3 SEOS TO NEOS 10/23/99 17:31 1 40 1 SR 1 43 1 5.5 1 CAPPED BY LOBA WH <br /> Notes: WEOS = West End of Seam <br /> EEOS = East End of Seam <br /> NEOS = North End of Seam <br /> SEOS = South End of Seam <br /> January 20W <br /> I/99/2011/1260/LOB/Seam xis Golder Associates 993-2011 <br />