Laserfiche WebLink
I <br />amet <br />General Project Items <br />Meetings and Discussions: The Contractor Meeting occurred on February 12, 2014 with CC &V Projects, Amec, and Ames. <br />Summary of Concerns: None. <br />CC &V: Daily updates, reporting and scheduling are some of the tasks occurring between CC &V Projects, Amec and Ames. <br />Miscellaneous: <br />A John Deere 870 excavator loaded shot rock for use as rip -rap into Cat 740 haul trucks near stations A3 +00 to A6 +50. The <br />shot rock was transported to the portable screening plant (Grizzly) located adjacent to the "Midway" equipment staging area. <br />A Cat D6 was removing snow for about an hour from the bottom of the PSSA in preparation for closure drain drilling. <br />Deliveries: None <br />Submitted by: Eric Lorenson Date: 15 Feb. 2014 <br />CQA Monitor <br />Reviewed By: /�� Date: <br />Tim Burkhard <br />Project Resident Man der _ <br />Plione: 719.689.2986 <br />Approved By: Date;;. -/ <br />CC&V Projects <br />Page 4 of 7 MLE2 WE 15Feb14.doc <br />