My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244 (312)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244 (312)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:10 PM
Creation date
2/25/2014 2:44:22 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/15/2008
Doc Name
Appendix 8 Full size drawing not elsewhere: Surface Water Diversion and Sediment Control Plan
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />z <br />w <br />x <br />w <br />J <br />U <br />N <br />ti <br />0 <br />D <br />0 <br />hV D <br />1' <br />N 51,000 <br />\� 1' U <br />i <br />0 <br />a <br />r <br />�r <br />L.. <br />/ %�� ���i`i / /iq•' -� <br />I <br />:�•.;,a :..::.:...:... . <br />Magog <br />Mill -o'er <br />ME <br />'1�1II d <br />U `ash• \� - �' kil .. <br />MOM <br />•a, +" a his •1 � <br />�t <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY BY CC &V WAS PFVISED FROM <br />PHOTOGRAPHY TAKEN 9 -28 -2006. SOME AREAS OF REVISION BASED IN <br />PART ON SURVEY DATA SUPPLIED BY FORESIGH? WES] SURVEYING tNC. <br />5 -29 -2007. S:ACAD \1125 - CC&V PHASE 5 <br />V;F \RECV \20070622 - PROJECT MAPA06110- TOPO- REVISED2DWG <br />400 0 400 800 FEET <br />Ell <br />J <br />1. <br />�1 <br />10' <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR AND EL, FEET <br />PROPOSED GROUND SURFACE CONTOUR AND EL, FEET <br />_..._ - EXISTING DRAINAGES <br />EXISTING ROAD /TRAIL <br />PROPOSED DIVERSION CHANNEL ALONG SOUTHEAST EDGE OF PILE <br />PROPOSED DIVERSION CHANNEL ALONG LOB HAUL ROAD <br />DIRECTION OF FLOW <br />WATERSHED CONTRIBUTION AREAS <br />35' <br />80' TRAVEL WIDTH <br />0.59 <br />45' <br />)TYPICAL LOB HAUL ROAD CROSS SECTION <br />A510 <br />2.5' <br />B )PHASE 5 VLF DIVERSION DITCH <br />510 AND ACCESS ROAD <br />NOTES: <br />1. RIPRAP IS NOT REQUIRED IF THE CHANNEL <br />BOTTOM IS IN BEDROCK. <br />0 <br />RIPRAP D501; <br />THICKNESS =12" <br />(SEE NOTE 1) <br />APR 15 HU <br />I d vNkon or RoclE-:. <br />Kning and <br />
The URL can be used to link to this page
Your browser does not support the video tag.