My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-04-15_REVISION - M1980244
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
2008-04-15_REVISION - M1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:52:03 PM
Creation date
2/25/2014 2:44:18 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Date
4/15/2008
Doc Name
Appendix 8 Full size drawing not elsewhere: Valley Leach Permitting 03/14/2008
From
CC&V
To
DRMS
Type & Sequence
AM9
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LOCATION MAP \ <br />NTS <br />APR 152003 <br />PREPARED FOR: <br />CRIPPLE CREEK & VICTOR <br />GOLD MINING COMPANY <br />AUTOCAD FlLENAME:1125C148 <br />PHASE 5 <br />VALLEY LEACH FACILITY <br />ISSUED FOR PERMITTING <br />MARCH 14,2008 <br />INDEX OF DRAWINGS <br />TITLE ALITOCAD FILENAME DRAWING NO. REV DATE <br />VLF TITLE SHEET <br />1125C148 <br />A000 <br />B <br />3/14/08 <br />EXISTING SITE CONDITIONS <br />1125M142 <br />A100 <br />B <br />3/14/08 <br />SITE GEOLOGY MAP <br />1125M104 <br />A110 <br />B <br />3/14/08 <br />HISTORIC UNDERGROUND WORKINGS <br />1125M146 <br />A120 <br />B <br />3/14/08 <br />SOIL LINER FILL BORROW AREA <br />1125M105 <br />A130 <br />B <br />3/14/08 <br />ULTIMATE ORE CONFIGURATION <br />1125M134 <br />A200 <br />B <br />3/14/08 <br />VALLEY LEACH FACILITY CROSS SECTIONS <br />1125D135 <br />A210 <br />B <br />3/14/08 <br />PHASE 5 GRADING PLAN <br />1125M145 <br />A220 <br />B <br />3/14/08 <br />CLOSURE DRAIN AND LVSC GENERAL PLAN <br />1125M157 <br />A225 <br />B <br />3/14/08 <br />VALLEY LEACH FACILITY SECTIONS AND DETAILS <br />1125D106 <br />A230 <br />B <br />3/14/08 <br />UNDERDRAIN DETAILS SHEET 1 OF 2 <br />1125D108 <br />A240 <br />B <br />3/14/08 <br />UNDERDRAIN DETAILS SHEET 2 OF 2 <br />1125D109 <br />A250 <br />B <br />3/14/08 <br />LEAK DETECTION AND TYPICAL EROSION CONTROL DETAILS <br />1125D110 <br />A260 <br />B <br />3/14/08 <br />UNDERGROUND WORKING REMEDIATION TYPICAL DETAILS <br />1125D111 <br />A270 <br />B <br />3/14/08 <br />PSSA LAYOUT AND DETAILS <br />1125M138 <br />A300 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 1 OF 7 <br />1125D140 <br />A305 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 2 OF 7 <br />1125D141 <br />A310 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 3 OF 7 <br />1125D144 <br />A315 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 4 OF 7 <br />1125D149 <br />A320 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 5 OF 7 <br />1125D150 <br />A325 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 6 OF 7 <br />1125D151 <br />A330 <br />B <br />3/14/08 <br />PSSA SECTIONS AND DETAILS SHEET 7 OF 7 <br />1125D112 <br />A335 <br />B <br />3/14/08 <br />PSSA RISER SECTIONS AND DETAILS SHEET 1 OF 3 <br />1125D114 <br />A340 <br />B <br />3/14/08 <br />PSSA RISER SECTIONS AND DETAILS SHEET 2 OF 3 <br />PSSA RISER SECTIONS AND DETAILS SHEET 3 OF 3 <br />1125D115 <br />1125D116 <br />A345 <br />A350 <br />B <br />B <br />3/14/08 <br />3/14/08 <br />CLOSURE UNDERDRAIN DETAIL <br />1125D157 <br />A355 <br />B <br />3/14/08 <br />HIGH VOLUME SOLUTION COLLECTION PIPING LAYOUT <br />1125M137 <br />A400 <br />B <br />3/14/08 <br />HIGH VOLUME SOLUTION COLLECTION SYSTEM DETAILS <br />1125D117 <br />A410 <br />B <br />3/14/08 <br />LOW VOLUME SOLUTION COLLECTION SYSTEM DETAILS SHEET 1 OF 2 <br />1125P147 <br />A420 <br />B <br />3/14/08 <br />LOW VOLUME SOLUTION COLLECTION SYSTEM DETAILS SHEET 2 OF 2 <br />1125D118 <br />A430 <br />B <br />3/14/08 <br />OPERATIONS WATERSHED SUBBASIN DELINEATION MAP <br />1125M136 <br />A500 <br />B <br />3/14/08 <br />SURFACE WATER DIVERSION AND SEDIMENT CONTROL PLAN <br />1125M143 <br />A510 <br />B <br />3/14/08 <br />SURFACE WATER DIVERSION SECTIONS AND DETAILS <br />1125D119 <br />A520 <br />B <br />3/14/08 <br />SEDIMENT COLLECTION POND RISER AND CULVERT DETAILS <br />1125D156 <br />A530 <br />B <br />3/14/08 <br />ORE RECLAMATION GRADING PLAN <br />1125M139 <br />A600 <br />B <br />3/14/08 <br />POST CLOSURE WATERSHED SUBBASIN DELINEATION MAP <br />1125M155 <br />A610 <br />B <br />3/14/08 <br />CRITICAL STABILITY PLAN AND CROSS SECTIONS SHEET 1 OF 3 <br />1125D152 <br />A700 <br />B <br />3/14/08 <br />CRITICAL STABILITY PLAN AND CROSS SECTIONS SHEET 2 OF 3 <br />11250153 <br />A710 <br />B <br />3/14/08 <br />CRITICAL STABILITY PLAN AND CROSS SECTIONS SHEET 3 OF 3 <br />1125D154 <br />A720 <br />B 13/14/08 <br />PREPARED BY: <br />am <br />SMITH WILLIAMS CONSULTANTS, INC. <br />Englewood, Colorado Elko, Nevada <br />Phone: 303 -433 -0262 Phone: 775-778-3200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.