Laserfiche WebLink
Colowyo Coal Company <br />2013 Annual Reclamation and Hydrology Report <br />Figure 7 -1— West Pit Fill Quarterly Inspection Reports <br />INSPFC'I ION REPOKI' WES! VI I [-ILL. <br />INDICA FE QUARTER > 1sl 0 2" ❑ 3 R ❑ 4 T1 ❑ 2013 <br />YEAR <br />+A11 QUARTERS NEED TO BE CER -RHED * <br />THE FOLLOWING ITEMS ARE TO BE INSPECTED AND REPOR FED AS NOTED: <br />1) Has any significant change been noted in the survey monuments on the fill? <br />No _ X Yes <br />If yes, explain <br />Date of Survey __ Survey not done inaccessible due to weather <br />Reviewed By- <br />2) Has any significant change been noted in the water level found in the fill monitoring <br />well? <br />No X Yes Measured Level 84.0 ft <br />If yes, explain <br />Date of Measurement 3/12/2013 <br />Measured By: T Peterson <br />3) Has there been any evidence of surficial slope failure on the face of the fill? <br />No X Yes <br />If yes, explain <br />Date of P.E. Inspection 3/12/2013 <br />Inspected By T. Peterson <br />4) Has there been any formation of springs or seeps on the face of the fill? <br />No X Yes <br />If yes, explain _ <br />Date of Inspection- 3/12/2013 <br />Inspected By. T. Peterson <br />0 L l Cdr 10�i <br />J {.ifs rf?n t o <br />l3 °�Fs ......... <br />TH P <br />P. 3 RSO <br />Reference Permit - Volume 5 -B, Exhibit 19, Page I a -4 <br />CF HSEQ 24 20 Revised March 7, 2006 <br />Page 7 -3 <br />