|
Colowyo Coal Company
<br />2013 Annual Reclamation and Hydrology Report
<br />Figure 3 -1— Completed CDRMS Annual Reclamation Report Form
<br />Colorado Division of Reclamation, Mining and Safety
<br />Annual Reclamation Report for the Year 2013
<br />Colowyo Mine
<br />mine name
<br />Address 5731 state H
<br />C -1981 -019
<br />permit #
<br />13 Meeker, CO 81'041
<br />Colowyo Coal Company L.P.
<br />Permittee
<br />This report, required by Rule 2 0413, is due by February 15 of each year, or other date, as agreed upon
<br />by the Division It should include text, discussion, and maps, at a minimum, in addition to any other
<br />reclamation monitoring data as required by the approved permit The location of the acreage reported
<br />under each land status category and year of seeding (if applicable) should be clearly and accurately
<br />identified on a map included with the report
<br />Seeding typically begins the minimum 10 -year reclamation liability period Please report the acres for
<br />aarh natann— hol— r)n not inch irlo acrac that hava nrhiovaH final Din— III roiaaca
<br />Last Years
<br />This Calendar
<br />Land Status Category
<br />Cumulative Total
<br />Year
<br />Cumulative Total'
<br />Acres disturbed
<br />3786 0
<br />+
<br />0
<br />_
<br />3786.0
<br />Acres backfllled and graded
<br />1366 44
<br />+
<br />95 8
<br />-
<br />1464 24
<br />Acres t0 oiled
<br />1090 25
<br />+
<br />162 9
<br />-
<br />1251 95
<br />Seeding typically begins the minimum 10 -year reclamation liability period Please report the acres for
<br />aarh natann— hol— r)n not inch irlo acrac that hava nrhiovaH final Din— III roiaaca
<br />- inciuoe, it necessary, a aescriprion or any augmentea seeoing or cu¢urai practices
<br />For the Entire Life of Mine, the total number of acres disturbed 3786.0 and the total number of acres
<br />Phase I released 1539.7 Phase II released 1341 , Phase III released 979 5
<br />For Mines in Permanent Cessation:
<br />Total acreage In facilities subject to reclamation but yet to be completed 201 40
<br />For Government Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 2 480 6
<br />Acreage in active mining areas 3 1961 5
<br />'(exclude acres where Phase III release has been achieved)
<br />' Includes haul and access roads, temporary dams and impoundments, permanent dams and impoundments, diversion and
<br />collector ditches, water and air monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construchon areas,
<br />office area, repair shops, and parking, coal stockpiles, loading, and processing areas, railroads, coal conveyors; nonbackfilled and
<br />graded areas of refuse piles, coal mine waste impoundments, heed -of- hollow fills, and valley fills, ventilation shafts and entryways,
<br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas)
<br />' Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Page 3 -3
<br />Last Years
<br />This
<br />Greater
<br />Cumulative
<br />Calendar
<br />Cumulative
<br />10 years or
<br />than 10
<br />Total
<br />year
<br />Total'
<br />less
<br />am '
<br />Acres seeded"
<br />1193 63
<br />+
<br />162 9
<br />=
<br />1356.53
<br />=
<br />1008 46
<br />+
<br />348.07
<br />- inciuoe, it necessary, a aescriprion or any augmentea seeoing or cu¢urai practices
<br />For the Entire Life of Mine, the total number of acres disturbed 3786.0 and the total number of acres
<br />Phase I released 1539.7 Phase II released 1341 , Phase III released 979 5
<br />For Mines in Permanent Cessation:
<br />Total acreage In facilities subject to reclamation but yet to be completed 201 40
<br />For Government Performance and Results Act
<br />Acreage in long -term mining or reclamation facilities 2 480 6
<br />Acreage in active mining areas 3 1961 5
<br />'(exclude acres where Phase III release has been achieved)
<br />' Includes haul and access roads, temporary dams and impoundments, permanent dams and impoundments, diversion and
<br />collector ditches, water and air monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construchon areas,
<br />office area, repair shops, and parking, coal stockpiles, loading, and processing areas, railroads, coal conveyors; nonbackfilled and
<br />graded areas of refuse piles, coal mine waste impoundments, heed -of- hollow fills, and valley fills, ventilation shafts and entryways,
<br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas)
<br />' Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded
<br />Page 3 -3
<br />
|