Laserfiche WebLink
Colowyo Coal Company <br />2013 Annual Reclamation and Hydrology Report <br />Figure 3 -1— Completed CDRMS Annual Reclamation Report Form <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2013 <br />Colowyo Mine <br />mine name <br />Address 5731 state H <br />C -1981 -019 <br />permit # <br />13 Meeker, CO 81'041 <br />Colowyo Coal Company L.P. <br />Permittee <br />This report, required by Rule 2 0413, is due by February 15 of each year, or other date, as agreed upon <br />by the Division It should include text, discussion, and maps, at a minimum, in addition to any other <br />reclamation monitoring data as required by the approved permit The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report <br />Seeding typically begins the minimum 10 -year reclamation liability period Please report the acres for <br />aarh natann— hol— r)n not inch irlo acrac that hava nrhiovaH final Din— III roiaaca <br />Last Years <br />This Calendar <br />Land Status Category <br />Cumulative Total <br />Year <br />Cumulative Total' <br />Acres disturbed <br />3786 0 <br />+ <br />0 <br />_ <br />3786.0 <br />Acres backfllled and graded <br />1366 44 <br />+ <br />95 8 <br />- <br />1464 24 <br />Acres t0 oiled <br />1090 25 <br />+ <br />162 9 <br />- <br />1251 95 <br />Seeding typically begins the minimum 10 -year reclamation liability period Please report the acres for <br />aarh natann— hol— r)n not inch irlo acrac that hava nrhiovaH final Din— III roiaaca <br />- inciuoe, it necessary, a aescriprion or any augmentea seeoing or cu¢urai practices <br />For the Entire Life of Mine, the total number of acres disturbed 3786.0 and the total number of acres <br />Phase I released 1539.7 Phase II released 1341 , Phase III released 979 5 <br />For Mines in Permanent Cessation: <br />Total acreage In facilities subject to reclamation but yet to be completed 201 40 <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 480 6 <br />Acreage in active mining areas 3 1961 5 <br />'(exclude acres where Phase III release has been achieved) <br />' Includes haul and access roads, temporary dams and impoundments, permanent dams and impoundments, diversion and <br />collector ditches, water and air monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construchon areas, <br />office area, repair shops, and parking, coal stockpiles, loading, and processing areas, railroads, coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, heed -of- hollow fills, and valley fills, ventilation shafts and entryways, <br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas) <br />' Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Page 3 -3 <br />Last Years <br />This <br />Greater <br />Cumulative <br />Calendar <br />Cumulative <br />10 years or <br />than 10 <br />Total <br />year <br />Total' <br />less <br />am ' <br />Acres seeded" <br />1193 63 <br />+ <br />162 9 <br />= <br />1356.53 <br />= <br />1008 46 <br />+ <br />348.07 <br />- inciuoe, it necessary, a aescriprion or any augmentea seeoing or cu¢urai practices <br />For the Entire Life of Mine, the total number of acres disturbed 3786.0 and the total number of acres <br />Phase I released 1539.7 Phase II released 1341 , Phase III released 979 5 <br />For Mines in Permanent Cessation: <br />Total acreage In facilities subject to reclamation but yet to be completed 201 40 <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 2 480 6 <br />Acreage in active mining areas 3 1961 5 <br />'(exclude acres where Phase III release has been achieved) <br />' Includes haul and access roads, temporary dams and impoundments, permanent dams and impoundments, diversion and <br />collector ditches, water and air monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construchon areas, <br />office area, repair shops, and parking, coal stockpiles, loading, and processing areas, railroads, coal conveyors; nonbackfilled and <br />graded areas of refuse piles, coal mine waste impoundments, heed -of- hollow fills, and valley fills, ventilation shafts and entryways, <br />and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas) <br />' Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Page 3 -3 <br />