Laserfiche WebLink
RECEIVED <br />FEB 18 2014 Page 2 of <br />112c Annual Report <br />11VISION OF RECLAMATION <br />MINING AND SAFETY <br />Permittee Name: City of Lamar Permit' Number: M -1977 -572 <br />Operation Name: Lamar East Pit County: Prowers <br />Annual Fee Due: $791.00 Anniversary Date: March 22, 2014 <br />Permit Acreage: 72.20 Current Bond Amt: $0.00 <br />According to C.R.S. 34 -32.5 -116 or 34 -32 -116, each year, on the anniversary date of the perniit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). YES NO <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? NO <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />fZ,Ecu+ ,M t-r, vo is u 13.o6mva q %i ^10 Lo, LL -3L- d01L t L&r( -p ' i AJ PWK-S i M IV i t A46W A4'W )6iZ; <br />4. What was the date of last excavation, processing or hauling activity at the mine? 09. 30. Z01A <br />5. Does the mine operate more than 180 days per year? <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various sta es of reclamation, since ennitted minim <br />Total acres Total acres Total acres <br />backfilled: C �� seeded w/ L�� w /topsoil <br />cJ approved mix: renlaced- <br />Total acres <br />Total acres <br />Topsoil <br />graded: <br />6� fertilized w/ (� <br />replacement <br />apvd fertilizer: `� <br />depth (in.): <br />Seed <br />application <br />Fertilizer <br />pol) C� application <br />ocll{'i�' <br />method: <br />method: <br />"0,4 <br />activities <br />YES E) <br />• <br />IDS, 13 <br />--151— <br />Total acres <br />mulched w/ <br />a roved mulch: <br />Mulch application <br />f rate (tons/ac): <br />Mulch <br />application <br />method: <br />