My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-20_REPORT - C1996083
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2014-02-20_REPORT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:40:07 PM
Creation date
2/20/2014 2:16:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
2/20/2014
Doc Name
DRMS Review of 02/17/2014 Site Inspection Report
From
DRMS
To
J.E. Stover & Associates
Permit Index Doc Type
Waste Pile/Fill Report
Email Name
SLB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2/20/2014 <br />STATE OF <br />js k ICOLORADO�� <br />State.co.us Eecutive Branch Mail - Re: Weeldy report <br />Hello Tamme - Thanks for sending me a copy of your report. Sounds like weather has been a challenge on the <br />gob piles. <br />Your report mentioned that a concrete patch will be placed in the roadway at the wash plant exit area. We will <br />need a minor revision including a reclamation cost estimate for the concrete work. We should be able to turn the <br />revision around in time for the March 7th longwall move. <br />agree that your observations of standing water and steep gob on Gob Pile 43 are of concern, and concur with <br />your suggestions to correct the problems. These issues should be handled as quickly as possible. <br />Your report also mentioned that coverfill material is being pulled from the stockpile to be mixed into the gob. It is <br />imperative that BRL maintain adequate cover material in the stockpile to provide the required depth of cover <br />material on the gob pile. BRL should identify the minimum volume of cover material needed fro reclamation and <br />mark it in the field so that ground crews remain aware of the limited amount of material available for mixing with <br />gob. If adequate material is not stockpiled, BRL would have to post additional performance bond for the import of <br />material and /or permit an additional borrow area. <br />Please let me know if you have any questions or need additional information on my comments. <br />Laserfiche filing: <br />C1996083 <br />02/20/2014 <br />Reports <br />Waste Pile /Fill Report <br />DRMS Review of 02/17/2014 Site Inspection Report <br />Susan L. Burgmaier <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />303 - 866 -3567 x 8111 <br />http://mining.state.co.us <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &\iev�-- pt &search =i nboy&th =14451 Gf8b2a3l e9e 1/2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.