Colorado Division of Reclamation, Mining, and Safety
<br />Annual Reclamation Report for the Year 2013
<br />Foidel Creek CO 82 -056 Twentymile Coal, LLC
<br />Mine Name Permit # Permittee
<br />Address: 29515 RCR27 Oak Creek, Colorado 80467
<br />This report, required by Rule 2.04.13, is due by February 15 of each year, or other date, as agreed upon by the
<br />Division. It should include text, discussion, and maps, at a minimum, in addition to any other reclamation monitoring data as
<br />required by the approved permit. The location of the acreage reported under each land status category and year of seeding (if
<br />applicable) should be clearly and accurately identified on a map included with the report.
<br />Land Status Category
<br />Last Years
<br />Cumulative Total
<br />This Calendar Year
<br />Cumulative Total t
<br />Acres permitted to be disturbed
<br />629.3
<br />9.5
<br />638.8
<br />Acres backfilled and graded
<br />121.1
<br />0
<br />121.1
<br />Acres topsoiled
<br />121.1
<br />0
<br />121.1
<br />201' ) backfilled and graded includes 6MN Pipeline (7.1 acres), 18LT Pipeline (7.5 acres), 18RT Vent Shaft (18.8 acres), and
<br />EMD Fan Site (2.8 acres)
<br />Seeding typically begins the minimum 10 -year reclamation liability period. Please report the acres for each category below.
<br />Do not include acres that have achieved final, Phase III release.
<br />*Include, if necessary, a description of any augmented seeding or cultural practices
<br />For the Entire Life of Mine, the total number of acres disturbed: 638.8 and the total number of acres:
<br />Phase I released 14.3 Phase lI released 0 Phase III released
<br />For Mines in Permanent Cessation
<br />Total acreage in facilities subject to reclamation but yet to be completed: N/A
<br />For Government Performance and Results Act
<br />Acreage in long term mining or reclamation facilities: 547.5 (from 2013 ARR Disturbed Acreage — includes "Active" and
<br />"Pending ")
<br />Acreage in active mining areas: N/A
<br />Excludes acres where Phase III release has been achieved
<br />Includes haul and access roads, temporary dams and impoundments permanent dams and impoundments, diversion and collector ditches, vNater and air
<br />monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construction areas, office area, repan shops, and parking, coal stockpiles.
<br />loading, and processing areas, railroads, coal conveyors, refuse piles and coal mine waste impoundments, head -of- hollow fills, valley fills, ventilation
<br />shafts and entryways. and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas)
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and eraded
<br />Last Years
<br />Cumulative
<br />This Calendar
<br />Cumulative
<br />10 years or less
<br />Greater than
<br />Total
<br />year
<br />Total
<br />10 years '
<br />Acres seeded*
<br />138.1
<br />0
<br />138.1
<br />0
<br />*Include, if necessary, a description of any augmented seeding or cultural practices
<br />For the Entire Life of Mine, the total number of acres disturbed: 638.8 and the total number of acres:
<br />Phase I released 14.3 Phase lI released 0 Phase III released
<br />For Mines in Permanent Cessation
<br />Total acreage in facilities subject to reclamation but yet to be completed: N/A
<br />For Government Performance and Results Act
<br />Acreage in long term mining or reclamation facilities: 547.5 (from 2013 ARR Disturbed Acreage — includes "Active" and
<br />"Pending ")
<br />Acreage in active mining areas: N/A
<br />Excludes acres where Phase III release has been achieved
<br />Includes haul and access roads, temporary dams and impoundments permanent dams and impoundments, diversion and collector ditches, vNater and air
<br />monitoring sites, topsoil stockpiles, overburden stockpiles, repair, storage and construction areas, office area, repan shops, and parking, coal stockpiles.
<br />loading, and processing areas, railroads, coal conveyors, refuse piles and coal mine waste impoundments, head -of- hollow fills, valley fills, ventilation
<br />shafts and entryways. and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas)
<br />3 Includes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and eraded
<br />
|