My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-19_HYDROLOGY - C1981018
DRMS
>
Day Forward
>
Hydrology
>
Coal
>
C1981018
>
2014-02-19_HYDROLOGY - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/29/2017 3:25:11 PM
Creation date
2/19/2014 2:05:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
Hydrology
Doc Date
2/19/2014
Doc Name
Stormwater Annual Report (COR-040172)
From
Blue Mountain Energy, Inc
To
WQCD
Annual Report Year
2013
Permit Index Doc Type
NPDES
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STORMWATER ANNUAL REPORT - METAL MINING (& COAL) <br />COLORADO DEPT. OF PUBLIC HEALTH & ENVIRONMENT <br />Water Quality Control Division <br />WQCD -P -B2 <br />4300 Cherry Creek Drive South <br />Denver, Colorado 80246 -1530 <br />Make enough copies of form for each reporting year. Or go to <br />www.cdphe.state.co.us /wq /Permits Unit Check if this is a <br />Permittee (Company Name): Blue Mountain Enemy. Inc. ❑ <br />Facility Name: Deserado Mine ❑ <br />Mailing Address: 3607 CR 65: Rangely, CO 81648 ❑ <br />Facility Phone Number: 970 - 675 -4322 ❑ <br />Permit Certification No. COR -04 0 1 7 2 <br />THIS IS A REQUIRED FIELD If this is not filled in the report will be returned. — Please do not input "0000" <br />Reporting Period: Jan. 1 -Dec. 31, 20 1 3 (Form is due by Feb. 15 of the following year) <br />* *Each section must be completed. Please print or type. ** <br />A. A report on the facility's overall compliance with the SWMP. (Include here a summary of any measures taken <br />to comply with your Stormwater Management Plan (SWMP), to fully implement it, changes or improvements <br />made in any of your Best Management Practices (BMPs), employee training, spills, other problems <br />encountered, etc. How is your plan working ?) <br />See attached (A) <br />Were changes made to your SWMP? ❑ No 1Yes - Describe changes on a separate sheet. <br />B. A summary of each comprehensive stormwater facility inspection made, including date, findings, and action <br />taken. (The permit requires at least two comprehensive facility inspections per year - see page 12 of the <br />permit. Include here a summary of those inspections, plus any other comprehensive inspections made. It is <br />not necessary to summarize day -to -day inspections, unless significant problems were noted.) <br />First Inspection - Date <br />See attached (B) <br />. Findings, and action taken: <br />Note - form may be reproduced Page 1 of 2 ar6 o6mm <br />
The URL can be used to link to this page
Your browser does not support the video tag.