COST SUMMARY WORK <br />Task description: Maintenance bldg demolition cost summary _ <br />Site: _ Gillette Pit _ Permit Action: TR06 Permit /Job #: M1992009 <br />PROJECT IDENTIFICATION <br />Task #: _ T60 _ State: Colorado _ Abbreviation: None <br />Date: 2/14/2014 County: Teller Filename: M009 -T60 <br />User: TC1 — -- - - - - -- -- - -- - <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Task <br />T61 <br />T62 <br />T63 <br />T64 <br />Description _ <br />Maintenance Building Demo <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />0.00 <br />Cost <br />$1,689.72 <br />$617.00 <br />$69493 <br />$817.73 <br />_ <br />DEMOLISH <br />1 <br />1 <br />1 <br />1 <br />Transport 6T steel offsite <br />MISCTRUK <br />8.00 <br />Transport 14 to 18 CY cone. rubble offsite <br />TRUCKI <br />2.98 <br />Mob /Demob Loader <br />MOBILIZE <br />3.00 <br />SUBTOTALS: <br />13.98 <br />$3,819.38 <br />INDIRECT COSTS <br />0.00 <br />OVERHEAD AND PROFIT: <br />Engineering work and /or contract/bid preparation: <br />Liability insurance: <br />2.02% <br />Performance bond: <br />1.05% <br />Job superintendent: <br />0.00 lirs <br />Profit: <br />10.00% <br />Total <br />Total <br />Total <br />Total <br />TOTAL O & P <br />CONTRACT AMOUNT (direct + O & P) <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />$77.15 <br />$40.10 <br />$0.00 <br />$381.94 <br />$499.19 <br />$4,318.57 <br />Financial warranty processing (legal /related costs): <br />0.00 <br />Total = 0.00 <br />Engineering work and /or contract/bid preparation: <br />0.0_0% <br />Total = <br />Reclamation management and /or administration: <br />5.00% <br />__$0.00 _ <br />$215.93 <br />CONTINGENCY: <br />0.00 <br />Total= $0 00 <br />TOTAL INDIRECT COST= $715.12 <br />TOTAL BOND AMOUNT (direct + indirect) = $4,534.50 <br />