Laserfiche WebLink
Annual Report <br />Permit #: M- 1977 -417 <br />RECEIVED <br />FEB 14 2014 <br />Division of Reclamation, <br />Mining & Safety <br />According to C.R.S. 34- 32.5 -116 or 34 -32 -116, each year, on the anniversary date of the permit, an operator shall <br />submit the annual fee, an annual report and map showing the extent of current disturbances to affected land, <br />required monitoring information, reclamation accomplished to date and during the preceding year, any new <br />disturbance that is anticipated to occur during the upcoming year, any reclamation that will be performed during <br />the upcoming year, the dates for the beginning of active operations, and the date active operations ceased for the <br />year, if any. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules <br />and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign post d in accordance with Rule 3.1.12 (1) YES <br />Sr� n will � e P a S-f�d Lao+4 ,11 4-he A e X'1'• � �v C&L yt. <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2) YES NO <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? YES <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. L <br />Mine 4 s known i- erm4I r VeSl gi+AC1!ith /1.04 her. e-4-1y Q�c�rto�A�G aI <br />was P' I m41•ke1� hrcPS a.� Gin.riwnt 4- vrrnadt"'O• <br />4. What tfie date of last exca ation, processing or hauling activity at the mine? r✓ �d <br />S. Does the mine operate more or less than 180 days per year? <br />If "LESS ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />Ope 4., n-�e j As 4 Sc1 6 P P — oplic i-*L-3 .-P iwS 1,.#e, Sept 30 ZOO <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation) <br />8. Number of acres that were newly affected during the current report year. <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />r� <br />MORE ES <br />YES <br />YES 0 <br />12. Total acres in various stages of reclamation, since permitted mining activities began: / 51? e a & c f�C/ <br />Ac- +.t,r`-es I�aiF-��a1 ve e � �.� Pr"wln* e4 i✓a5� vu;ck Ut•kmp. /D -;7-e // <br />Total acres <br />Total acres <br />Total acres <br />Total acres <br />backfilled: <br />seeded w/ <br />w /topsoil <br />mulched w/ <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />Mulch application <br />graded: <br />fertilized w/ <br />replacement <br />rate (tons): <br />a vd fertilizer: <br />depth (in.): <br />Seed <br />Fertilizer <br />Mulch <br />application <br />application <br />application <br />method: <br />method: <br />method: <br />