My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REVISION - M1979094HR (5)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979094
>
2014-02-07_REVISION - M1979094HR (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:30:06 PM
Creation date
2/13/2014 1:49:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979094HR
IBM Index Class Name
REVISION
Doc Date
2/7/2014
Doc Name
Revised DDP
From
Whetstone Associates
To
DRMS
Type & Sequence
AM1
Email Name
TC1
DMC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD -7 Mine - Drainage Design Plan v <br />Figure 47. Downstream Hydrograph for the Planned Open Pit Diversion Structure East Segment 1 <br />(PitDivE_P) .................................................................................................. ............................... 81 <br />Figure 48. Downstream Hydrograph for the Planned Open Pit Diversion Structure East Segment 2 <br />(PitDivE —P2) ................................................................................................ ............................... 82 <br />Figure 49. Hydrographs for Planned SCN Pond ........................................................... ............................... 89 <br />LIST OF PLATES <br />Plate 1. JD -7 Mine Major Drainage Basins, Lease Boundary, and Mine Facilities <br />Plate 2. Engineering Drawing for the Expanded Pit Pool Retention Pond <br />Plate 3. Engineering Drawing for the Improved Conveyance Structures Pit Diversion East (PDEC), Pit <br />Diversion West (PDWC), and Open Pit Waste Rock Diversion (OPWRD) <br />Plate 4. Engineering Drawing for the Expanded Catchments OO1B -A North and OO113-A South <br />Plate 5. Engineering Drawing for the Planned Stormwater Conveyance Structures Pit Diversion East <br />(PDEP) and Pit Diversion West (PDWP) <br />Plate 6. Engineering Drawing for the Planned Stormwater Conveyance Structures Open Pit Waste Rock <br />Diversion (OPWRP) and North Diversion West (NDP) <br />Plate 7. Engineering Drawing for the Planned Stormwater Catchment Northwest (SCN) <br />LIST OF ATTACHMENTS <br />Attachment 1. Time of Concentration Calculations for Modeled Sub - Basins <br />Attachment 2. Areas and Composite Curve Numbers for Modeled Sub - Basins <br />Attachment 3. Rip Rap Granular Bedding Specifications (from UDFCD 2008) <br />Attachment 4. Culvert Hydraulic Profiles <br />Attachment 5. WinTR -55 and HydroCAD Output Files for Current Condition <br />Attachment 6. Channel Stability Analysis — WinXSPro Output Files for Current Condition <br />Attachment 7. WinTR -55 and HydroCAD Output Files for Planned Condition <br />Attachment 8. Channel Stability Analysis — WinXSPro Output Files for Planned Condition <br />4149A.140207 Whetstone Associates <br />
The URL can be used to link to this page
Your browser does not support the video tag.