Laserfiche WebLink
JD -7 Mine - Drainage Design Plan <br />Table 9. Runoff Curve Numbers for JD -7 Mine ........................................................... ............................... <br />19 <br />Table 10. <br />Sub - Basins Contributing Non - Contact Stormwater to Diversion Structures and to the Valley <br />Floor............................................................................................................. ............................... <br />22 <br />Table 11. <br />Sub - Basins Within the JD -7 Mine Permit Area ............................................ ............................... <br />25 <br />Table 12. <br />Downstream Receiving Sub - Basins .............................................................. ............................... <br />31 <br />Table 13. <br />Reach Geometry and Hydraulic Parameters .................................................. ............................... <br />33 <br />Table 14. <br />Stage- Storage Data for Expanded Pit Pool Stormwater Retention Pond ...... ............................... <br />37 <br />Table 15. <br />Existing Stormwater Retention Ponds ........................................................... ............................... <br />38 <br />Table 16. <br />Stage- Storage Data for Existing Stormwater Retention Ponds 001B -A South and 001B -A North38 <br />Table 17. <br />Stage, Area, and Storage for Expanded Stormwater Catchment 001B -A North .......................... <br />40 <br />Table 18. <br />Stage, Area, and Storage for Expanded Stormwater Catchment 001B -A South .......................... <br />40 <br />Table 19. <br />List of Runoff Model Runs - Current Condition .......................................... ............................... <br />43 <br />Table 20. <br />Sub -Basin Areas, Receiving Reach, Weighted Average Curve Number, and Time of <br />Concentration in TR55 Models .................................................................... ............................... <br />47 <br />Table 21. <br />Peak Flow (cfs) and Peak Time (hr) by Rainfall Return Period (Current Condition) .................. <br />49 <br />Table 22. <br />Comparison of TR -55 Model and Regression Analysis Results for Peak Flow ........................... <br />53 <br />Table 23. <br />Conveyance Capacity for Diversion Structures ............................................. ............................... <br />53 <br />Table 24. <br />Channel Stage to Convey 100 -year Peak Flow ............................................. ............................... <br />54 <br />Table 25. <br />Channel Stage, Velocity, and Shear Stress for 100 -year Peak Flow ............. ............................... <br />56 <br />Table 26. <br />Culvert Capacity for 100 -year 24 -hour Storm Event .................................... ............................... <br />61 <br />Table 27. <br />Sub - Basins Contributing Non - Contact Stormwater to Diversion Structures and to the Valley <br />Floor Based on Planned Condition ............................................................... ............................... <br />65 <br />Table 28. <br />Sub - Basins Within the Reclaimed JD -7 Mine Permit Area Based on Planned Condition........... <br />66 <br />Table 29. <br />Planned Surface Water Control Structures .................................................... ............................... <br />66 <br />Table 30. <br />Reach Geometry and Hydraulic Parameters - Planned ................................. ............................... <br />67 <br />Table 31. <br />Stage- Storage Data for the Planned Stormwater Catchment Northwest (SCN) Pond .................. <br />71 <br />Table 32. <br />Stage- Storage Data for USP DP- 12 ............................................................... ............................... <br />73 <br />Table 33. <br />List of Runoff Model Runs for Planned Runoff Routing .............................. ............................... <br />74 <br />Table 34. <br />Sub -Basin Areas, Receiving Reach, Weighted Average Curve Number, and Time of <br />Concentration in TR55 Models (Planned) ................................................... ............................... <br />74 <br />Table 35. <br />Peak Flow (cfs) and Peak Time (hr) by Rainfall Return Period (Planned) ... ............................... <br />77 <br />Table 36. <br />Conveyance Capacity for Planned Diversion Structures ............................... ............................... <br />82 <br />Table 37. <br />Channel Stage to Convey 100 -year Peak Flow in Planned Diversion Structures ........................ <br />83 <br />Table 38. <br />Channel Stage, Velocity, and Shear Stress for 100 -year Peak Flow in the PDEP and PDWP <br />Diversion Ditches (Planned) ........................................................................ ............................... <br />84 <br />Table 39. <br />Channel Stage and Velocity for 10 -Year and 100 -year Peak Flow in the OPWRDP and NDP <br />DiversionDitches (Planned) ........................................................................ ............................... <br />86 <br />LIST OF FIGURES <br />Figure 1. Photo Showing Dry Drainage and Sandy Streambed in Major Sub -Basin B2 ............................... 2 <br />Figure 2. Photo Facing Downstream (North) Showing Drainage Characteristics on Valley Floor in Sub - <br />Basin B2, South of JD -7 Topsoil Stockpile ................................................... ............................... 3 <br />Figure 3. Minor Sub - Basins Modeled Within Major Sub -Basin B3 (Current Condition) ............................. 5 <br />Figure 4. Location of Sheet Flow, Shallow Concentrated Flow, and Channel Flow within a Basin ............. 7 <br />Figure 5. Soil Types in Vicinity of JD -7 Mine .............................................................. ............................... 20 <br />Figure 6. Spatial Distribution of Curve Numbers across the JD -7 Mine Area (Current) ............................. 21 <br />Figure 7. Photograph Showing Pit Diversion West ....................................................... ............................... 23 <br />Figure 8. Aerial Photograph showing Alluvial Fan and Braided Ephemeral Channels on Valley Floor near <br />Sub - Basins N -J and N- K .............................................................................. ............................... 24 <br />4149A.140207 Whetstone Associates <br />