Laserfiche WebLink
JD -7 Mine — Drainage Design Plan 34 <br />4.4.1 Pit Diversion Ditch — West <br />The Pit Diversion Ditch West (PDW) diverts stormwater from upslope around the existing JD -7 Open Pit <br />and routes it westward into a natural channel in the adjacent sub -basin N -E. The PDW was constructed in <br />1980 and has been improved and maintained in subsequent decades. The PDW has achieved a relatively <br />stable channel configuration over time, and is 1,144 ft in length with an average bed slope of 0.0213. The <br />excavated channel has a broad floor (10 to 20+ ft) and top widths range from 23 ft (measured) to over 35 <br />feet (visual estimate). The channel currently has shallow sloping sides with an average slope of 4.6:1 based <br />on field- measured profiles4 (Figure 15, Figure 16). On average, the existing channel has a 2.2 -ft bottom <br />width and 4.6:1 ft side slopes. The channel is normally dry, and flows only in response to precipitation <br />events. <br />The PDW will be improved/maintained to achieve a prismatic channel geometry as shown in Figure 15 and <br />Plate 3. The channel will be reconstructed with an 8 -ft bottom width and 3:1 side slopes. The PDW will <br />have a uniform slope of 2.1% along its 1144 -ft length. Stability analysis for the improved structure is <br />provided in Section 5.4.1. <br />x 0.00 <br />L <br />y 1.00 <br />a 1.00 <br />e 2.00 <br />C <br />A <br />v 3.00 <br />c 2.00 <br />C <br />A <br />v 3.00 <br />0 <br />1 <br />2 <br />3 <br />4 <br />5 <br />6 <br />7 <br />8 <br />9 <br />10 <br />11 <br />12 <br />13 <br />14 <br />15 <br />16 <br />17 <br />18 <br />19 <br />20 <br />21 <br />22 <br />23 <br />24 25 <br />Distance (ft) <br />9 0.00 <br />r <br />a 1.00 <br />e 2.00 <br />C <br />A <br />v 3.00 <br />0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 <br />Distance (ft) <br />F 0.00 <br />L <br />1.00 <br />2.00 ♦__�_�__ �� -�___ �� <br />= 3.00 <br />A <br />U 4.00 <br />0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 <br />Distance (ft) <br />Figure 15. Channel Profiles Measured and Improved in Pit Diversion West <br />4 Channel side slopes were measured at 5.3:1 and 4.3:1 for the left bank and right bank of Profile PDW -1, and at 5.6:1 and 3.1:1 for <br />the left bank and right bank of Profile PDW -2. <br />4149A.140207 Whetstone Associates <br />