Laserfiche WebLink
JD -7 Mine - Drainage Design Plan 1 <br />TABLE OF CONTENTS <br />1. INTRODUCTION ................................................................... ............................... <br />1.1 <br />Purpose ................................................................................................... ............................... <br />1 <br />1.2 <br />Overview - Runoff Areas and Routing ................................................... ............................... <br />1 <br />1.3 <br />List of Abbreviations .............................................................................. ............................... 3 <br />2. DESIGN <br />CRITERIA & METHODOLOGY ............................................................. ............................... 6 <br />2.1 <br />Design Storms ........................................................................................ ............................... 6 <br />2.2 <br />Runoff Estimates .................................................................................... ............................... 6 <br />2.2.1 Volume ....................................................................................... ..............................6 <br />34 <br />2.2.2 Peak Discharge .......................................................................... ............................... 7 <br />35 <br />2.2.3 Computational Methods ............................................................ ............................... 9 <br />4.4.3 Open Pit Waste Rock Pile Diversion ...................................... ............................... <br />2.2.3.1 Spreadsheet Simulation ................................................ ............................... 9 <br />2.2.3.2 NRCS WinTR- 55 .......................................................... ..............................9 <br />36 <br />2.2.3.3 Regression Analysis ................................................... ............................... <br />10 <br />37 <br />2.2.3.4 HydroCAD ................................................................. ............................... <br />12 <br />2.3 <br />Structure Design ................................................................................... ............................... <br />12 <br />37 <br />2.3.1 Channel Capacity .................................................................... ............................... <br />12 <br />37 <br />2.3.2 Channel Stability ..................................................................... ............................... <br />13 <br />39 <br />2.3.3 Culverts ................................................................................... ............................... <br />15 <br />42 <br />2.3.4 Retention Ponds and Spillways ............................................... ............................... <br />15 <br />43 <br />2.3.5 Riprap / Granular Bedding / Gravel Mulch ............................. ............................... <br />15 <br />3. HYDROLOGIC CHARACTERISTICS OF SITE SOILS ...................................... ............................... 17 <br />4. STORMWATER ROUTING (CURRENT CONDITION) ..................................... ............................... <br />22 <br />4.1 <br />Sub - Basins Contributing Stormwater to Diversion Structures and Valley Floor ................ <br />22 <br />4.2 <br />Sub - Basins and Stormwater Routing on the JD -7 Mine Site ............... ............................... <br />25 <br />4.3 <br />Sub - Basins Receiving Stormwater Downstream of the JD -7 Mine Site ............................. <br />31 <br />4.4 <br />Reach Definition ................................................................................... ............................... <br />31 <br />4.4.1 Pit Diversion Ditch — West ...................................................... ............................... <br />34 <br />4.4.2 Pit Diversion Ditch — East ....................................................... ............................... <br />35 <br />4.4.3 Open Pit Waste Rock Pile Diversion ...................................... ............................... <br />35 <br />4.4.4 Stormwater Collection Ditches for the Underground - Waste -Rock Pile ................ <br />36 <br />4.5 <br />Storage Structures ................................................................................. ............................... <br />37 <br />4.5.1 Pit Pool Retention Pond .......................................................... ............................... <br />37 <br />4.5.2 Retention Ponds 001B -A North and 001B -A South ................ ............................... <br />37 <br />4.5.2.1 Current Design ........................................................... ............................... <br />37 <br />4.5.2.2 Retention Pond Expansion ......................................... ............................... <br />39 <br />4.5.3 Upstream Storage Ponds ( USPs) ............................................. ............................... <br />42 <br />4.6 <br />Model Implementation of Stormwater Routing ................................... ............................... <br />43 <br />4.7 <br />Transmission Losses, Channel Infiltration ........................................... ............................... <br />47 <br />5. MODEL RESULTS (CURRENT CONDITION) .................................................... ............................... 48 <br />4149A.140207 Whetstone Associates <br />