Laserfiche WebLink
PR -06 2nd <br />DESCRIPTION <br />LOCATION OF ANSWER <br />Adequacy <br />June 2010 <br />Question # <br />20A <br />Correct page numbering errors on <br />See revised Section 2.05.3(3) <br />attachments <br />and associated attachments. <br />21 <br />Remove blank pages from Attachment <br />See revised Attachment <br />2.05.3(3) -8 <br />2.05.3(3) -8 <br />22 <br />Correct statement in Section 2.05.3(3) <br />Resolved <br />Mine Facilities on page 14 -2 that states <br />that the pre -mine drainage basins have <br />changed. <br />23 <br />Provide Map 2.05.3(3) -17 <br />See attached Map 2.05.3(3) -17. <br />24 <br />Provide Attachment 2.05.3(3) -13 and map <br />Unnecessary, as Attachment <br />2.05.3(3) -12 -4 <br />2.05.3(3) -13 and Map <br />2.05.3(3) -12 -4 are as- builts and <br />have not changed. <br />25 <br />Provide Map 2.05.3(3) -18 <br />See attached Map 2.05.3(3) -18. <br />26 <br />Correct Attachment 2.05.3(3) -14 and <br />See revised Attachment <br />2.05.3(3) -22 cover pages. <br />2.05.3(3) -14 and Attachment <br />2.05.3(3) -22.. <br />27 <br />Revise Attachment 2.05.3(3) -20 for Pond <br />Resolved <br />015 design and certification. <br />28 <br />Revise Attachment 2.05.3(3) -20 for Pond <br />Resolved <br />015 design for spillway inconsistencies <br />29 <br />Fix text on pages 3 and 4 of Attachment <br />Resolved <br />2.05.3(3) -7 for Small Area Exemptions, <br />since the only SAE is the topsoil stripping <br />ahead of the pit. <br />30 <br />Fix spelling on cover page to Attachments <br />Resolved <br />2.05.4(2)(c) -5 and 6. <br />31 <br />Revise page 5 of Section 2.05.4(2)c) to <br />Resolved <br />show 2007 date for current contours. <br />32 <br />Clarify text in Section 2.05.4(2)c) and <br />Resolved <br />Section 2.05.3(3) to state whether Pond <br />014 is reclaimed or not. <br />33 <br />Clarify boundaries on Map 2.05.4 -1. <br />See revised Map 2.05.4 -1 <br />34 <br />Clarify dryland slope text. <br />See revised Section 2.05.4(2)(c) <br />