Laserfiche WebLink
Dave Berry Letter <br />Description <br />Location of Answer <br />May 18, 2010 <br />Question # <br />6 <br />All sections of the permit must be <br />Throughout the entire PR -06 <br />reconciled to provide consistent <br />submittal. <br />content compliance with all <br />requirements. Although the land issues <br />are extremely complex and <br />voluminous, WFC has tried to provide <br />this reconciliation among all sections <br />of the permit. <br />7 <br />All pending adequacy issues must be <br />Throughout the entire PR -06 <br />fully and adequately addressed. WFC <br />submittal. <br />has made a strong attempt to <br />accomplish this, as each item is <br />addressed in this letter. <br />8 <br />All plans must be coordinated with the <br />See revised Attachment <br />landowners. Provide documentation. <br />2.05.4(2)(e) -8 <br />WFC has revised the Morgan property <br />reclamation to be exactly what they <br />desire (full irrigated cropland). The <br />Lloyd and Benson west properties have <br />also been revised to include flood <br />irrigated pasture, to the extent that the <br />water is available. All properties on the <br />east side of 2700 Road are in various <br />stages of reclamation and many <br />landowners have been present for the <br />bond release inspections. <br />9 <br />WFC disputes that soils management <br />See attached documentation. <br />practices were implemented without <br />the consultation with the landowner. <br />WFC continues to work with the <br />landowner on the entire Permit <br />Revision 06 and has provided a full <br />copy of the submittal to them. WFC <br />will also do its best to provide <br />documentation of resolution of the <br />permit issues, if they ever can be <br />obtained. <br />12 <br />