Laserfiche WebLink
PR -06 2 °d <br />DESCRIPTION <br />LOCATION OF ANSWER <br />Adequacy <br />June 2010 <br />Question # <br />80A <br />Specify that Bench 1 Subsoil Substitute <br />See Section 2.05.4(2)(d): <br />will be subjected to the same sampling <br />Tables 2.05.4(2)(d) -lA & B <br />plan as Lift B Topsoil <br />80B <br />Specify that 2 "a phase sampling will take <br />See revised Section <br />place on a tighter grid than in the current <br />2.05.4(2)(d): sub - section 14.0 <br />permit. <br />& 15.0 <br />80C <br />Commit to follow -up sampling that <br />See revised Section <br />ensures a maximum size of non- <br />2.05.4(2)(d): sub - section 14.0 <br />remediated areas as determined by DRMS. <br />& 15.0 <br />80D <br />Commit to maintaining approved post <br />See revised Section <br />mine topography as part of spoil and soil <br />2.05.4(2)(d): sub - section 14.0 <br />remediation. <br />& 15.0 <br />81 <br />State that replaced subsoil and topsoil will <br />Resolved <br />be measured and reported and submitted <br />with the Annual Report. <br />82 <br />Correct reference to Map 2.04.10 -1 on <br />Resolved <br />page 2.04.9 -9. Fix reference to Table <br />2.04.3 -1 on the same page. <br />83 <br />Clarify the increase in elevation on the <br />Resolved <br />Benson West property due to excess <br />overburden from Morgan material swell. <br />84 <br />Clarify the spoil spring potential water <br />See revised Section 2.05.6(3) <br />flows. Identify Spoil Spring Sample <br />and Map 2.04.7 -1A <br />locations related to both NH2 and NH1 <br />While this table contains a guide of where each item of adequacy is addressed, due to the overhaul <br />of several sections (2.04.9, 2.05.4(2)(d), & 2.05.4(2)(e)), it should not be used to substitute a <br />completer review of the sections for changes. <br />10 <br />