My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-11_GENERAL DOCUMENTS - C1992081
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1992081
>
2014-02-11_GENERAL DOCUMENTS - C1992081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:53 PM
Creation date
2/12/2014 1:12:06 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1992081
IBM Index Class Name
General Documents
Doc Date
2/11/2014
Doc Name
Proposed Decision and Findings of Compliance (RN-4)
From
DRMS
To
Hayden Gulch Terminal, LLC
Permit Index Doc Type
Findings
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A. The Division will require that each hole, well, or other underground opening be capped, <br />sealed, backfilled, or otherwise properly managed (4.07.3). <br />VI. Use of Explosives — Rule 4.08 <br />No specific approvals are granted to the applicant under this section. <br />VII. Disposal of Excess Spoil — Rule 4.09 <br />No specific approvals are granted to the applicant under this section <br />VIII. Coal Mine Waste — Rule 4.11 <br />There will be no coal mine waste generated by the proposed operations at the Loadout. <br />Crushing and sizing operations were conducted at the Loadout; however, all coal was loaded <br />onto trains or trucks and transported from the site. <br />A small temporary waste storage (TWS) pile has been previously permitted on the north <br />side of the TAHR. This TWS pile is located west of the intersection with an access road to <br />the Mesa Gravel Pit (Exhibit 13- 11.5). <br />IX. Backfilling and Grading <br />Backfilling and grading is discussed under Tabs 17, 18, and 23 of the permit application. <br />Backfilling and grading operations will return the disturbed area associated with the Loadout <br />to the approved post- mining topography in conjunction with the closure and final <br />reclamation of the facility. <br />The truck and train loading structures were dismantled, removed and the facilities and coal <br />stockpile area regraded in 2011. Backfill and grading of 11.9 acres of the facilities area was <br />approved for Phase I bond release with SL1, July 27, 2012. <br />The TAHR was originally included in the Seneca II -W permit (C- 1982 -057). The acreage is <br />separate from the backfill and grading schedule and reclamation schedule of the facilities <br />located at the load out. The road is currently approved to remain in place until year 2030. <br />X. Reve eta ation <br />Vegetation baseline information can be found in Tab 10 with plant community types <br />identified on Exhibit 10 -1 of the application. Revegetation plan information and methods to <br />be utilized in determinations of revegetation success are addressed in Tab 20 and Exhibit 18- <br />1. <br />Hayden Gulch 29 February 11, 2014 <br />
The URL can be used to link to this page
Your browser does not support the video tag.