Laserfiche WebLink
Stipulation No. 9: Prior to initiation of reclamation for lands associated with the Tie - Across <br />Haul Road, the permittee shall submit a technical revision to the permit which provides a <br />reclamation plan, sampling methodologies and reclamation success requirements for the <br />cropland areas in accordance with Rule 2.05.4(2)(e), Rule 4.15.1(2)(c), Rule 4.15.9 and Rule <br />4.15.7(2). The technical revision needs to be approved prior to initiation of reclamation <br />activities associated with the Tie - Across Haul Road cropland areas. <br />Bonding Liability <br />The operator, HGT, will be bonded for an amount sufficient for the Division to accomplish all <br />requirements for reclamation, should the need arise. Based upon a review of the applicant's <br />worst -case estimate, the Division has determined the total bond liability for the site to be <br />$1,142,203.32. Detailed reclamation cost estimates and liability information can be found in <br />Volume 2, Tab 23 of the permit application and a summary given in Section B, below. <br />Hayden Gulch 16 February 11, 2014 <br />