Laserfiche WebLink
A <br />1 plan for topsoil removal and redistribution on the <br />2 Morgan property? And this includes materials to be <br />3 removed, storage, redistribution, reconditioning, <br />4 and suitability of soils. <br />5 We also identified Rules 2.06.6 and <br />6 4.25, prime farmlands. Have the provisions for <br />7 prime farmlands been addressed pursuant to the <br />8 requirements of these rules? <br />9 And then the last one that we <br />10 identified was opportunity for public participation. <br />11 Have the provisions for public participation been <br />12 followed according to Rule 2.07.1? <br />13 So those are the issues we <br />14 identified. The witnesses and exhibits were to be <br />15 turned in to all parties on Monday, November 8, <br />16 2010. However, subsequent to that, we allowed to go <br />17 to the close of business on Wednesday, November 10, <br />18 for everybody to get their submissions in to all <br />19 parties. <br />20 The procedure that was adopted at the <br />21 prehearing conference was, as you see before you, <br />22 we're working on Number 1 right now, your <br />23 consideration of this adoption and order, and then <br />24 we worked out in detail who would go and how long <br />25 they would have. <br />