My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:49 PM
Creation date
2/11/2014 3:22:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/7/2014
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Compa <br />Mill Site Earthworks <br />Photograph Log <br />amee-,` <br />PHOTO <br />NUMBER <br />DATE <br />DESCRIPTION <br />1 <br />September 24, 2013 <br />Exposing the existing geomembrane liner <br />2 <br />September 24, 2013 <br />Removing sharp rocks from the random fill subgrade <br />3 <br />September 24, 2013 <br />Preparing the random fill subgrade <br />4 <br />September 24, 2013 <br />Preparing the random fill subgrade <br />5 <br />September 25, 2013 <br />Continuing to expose the existing geomembrane liner <br />6 <br />October 14, 2013 <br />Drilling holes for the placement of expansion anchors <br />7 <br />October 14, 2013 <br />Using a hammer to set the expansion anchors <br />8 <br />October 16, 2013 <br />GCL Seaming <br />9 <br />October 16, 2013 <br />Deploying GCL <br />10 <br />October 16, 2013 <br />Replacing a section of pipe <br />11 <br />October 16, 2013 <br />Deploying geomembrane <br />12 <br />October 16, 2013 <br />Seaming the new geomembrane <br />13 <br />October 17, 2013 <br />Continuing to deploy the new geomembrane <br />14 <br />October 17, 2013 <br />Pressure testing a completed fusion seam <br />15 <br />October 17, 2013 <br />Seaming the new liner to the existing liner <br />16 <br />October 17, 2013 <br />Attaching the geomembrane to the existing concrete <br />17 <br />October 19, 2013 <br />Sealing aroung the new pipe boot <br />18 <br />October 19, 2013 <br />Grinding to prepart the geomembrane for welding <br />19 <br />October 19, 2013 <br />Extrusion welding a repair <br />20 <br />October 25, 2013 <br />Compacting backfillin the anchor trench <br />21 <br />October 31, 2013 <br />Installing the PVC pipe extension <br />22 <br />November 1, 2013 <br />Placing Drain Cover Fill <br />23 <br />November 9, 2013 <br />Placing and Compacting Drain Cover Fill <br />24 <br />November 11, 2013 <br />Compacting Drain Cover Fill near existing pipes <br />25 <br />November 12, 2013 <br />Continuing to place and compact Drain Cover Fill <br />26 <br />November 14, 2013 <br />Compacting for the concrete footings <br />27 <br />November 15, 2013 <br />Excavating for the concrete footings <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.