My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (3)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:39:49 PM
Creation date
2/11/2014 3:22:36 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
REPORT
Doc Date
2/7/2014
Doc Name
Final Report Quality Assurance Monitoring & Test Results
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 0 <br />- o l• <br />o•. <br />67 <br />w <br />a6 a <br />w w <br />w <br />a^ <br />w <br />w <br />LEGEND <br />LEI <br />EXISTING GROUND SURFACE CONTOUR <br />qCpvp <br />'' __ - i _ <br />i <br />.. <br />EXISTING UNIMPROVED ROAD/TRAJLS <br />n I o _ ❑ <br />0 <br />Q� <br />EXISTING DRAINAGES <br />SITE LOCATION <br />STATE HIGHWAY <br />67 <br />ate. <br />J� <br />861 COUNTY ROAD <br />a <br />81 <br />�i 4 <br />I <br />I <br />N 59.000 <br />�� <br />0 <br />4__ <br />• <br />� � � <br />� A,1 <br />squAe <br />-� <br />81 <br />GULCH VLF <br />AN5 <br />6. <br />srrE <br />_ <br />67 <br />i <br />j PHASE IV VLF <br />/ <br />V. <br />81 <br />j <br />N 53,000 <br />/ <br />REFERENCE: <br />1/ \\ <br />l .� <br />/' <br />/ <br />EXISTING GROUND TOPOGRAPHY WAS CREATED 8Y COMBINING THE FOLLOWING FILES <br />RECV AMFORESIGHT WO SURVEYING, <br />SQUWGULCH BASE HAS 1 — REYSED.OWG <br />�RE CY MARCH ,. a. 2010) <br />'\� <br />— / --- PHASE 5 VLF \` <br />, <br />a..:� ° a <br />SQUAW GULCH BASE TOPO — PHASE 2.DWG <br />•, 4 <br />'� I // <br />/ <br />P <br />(RECV APRIL 24. 2010) <br />SQUAW <br />( GULCH HOSE TOPO — PHASE 3.DWG <br />RELY MAY 4, 2010) <br />r <br />/ ,w / / / <br />/ <br />CC, TORO EXPANSION 12 -29 -10 NORTH AREA.DWG <br />(RECV 13, 2011) <br />,•u T <br />jANUARY <br />CC/ TOPO EXPANSION 01 -28 UTH —11 SO AR-DWG <br />(RECV JANUARY 28. 2011) <br />PHASE II VLF <br />SH67 TOPO 7- 07- 1l.DWG <br />(RECV JULY 11. 2011) <br />1 <br />v — — <br />\ <br />/ <br />�� <br />VLF2 TOPO EXPANSION 8- 05- 11.DWG <br />(RECV AUGUST 9, 2011) <br />PHASE I VLF <br />1 <br />_/� <br />A, <br />09028- COMOSTTH -TOPO MILE UMrrs.DWG <br />(RECV MAY 28, 2010 FROM CC&V) <br />N 50,000 <br />SITE j <br />LOCATION �/ <br />`O 4_4 <br />0 <br />B00 0 B00 1600 FEET <br />' I - ! <br />r/r <br />CLIENT CRIPPLE EEKC& VICTOR <br />GOLD EMINING <br />PROJECT <br />PSES PIPE RACK LINER EXTENSION <br />y \\ /— f —�' �•/ a,I' 81 <br />f <br />_ o <br />TITLE <br />67 <br />e <br />d �° , 67 <br />i <br />PSES PIPE RACK LINER EXTENSION <br />no - : <br />D Y° <br />'p- <br />861 <br />( <br />SITE LOCATION <br />a <br />111 <br />DESIGNED BY <br />AW <br />CHECKED BY <br />MEN <br />paR, <br />0 <br />C$ $'° � °• <br />` <br />- N 47,000 <br />-_. <br />•c •J ., <br />-..... _ -.- _- _ -4- <br />- <br />ame C <br />DRAWN BY <br />A U/ <br />APPROVED BY <br />MEN <br />n ENAME <br />FIGURE No. <br />REV <br />FIGURE 1 <br />1 <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.