Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />PSES Pipe Rack Liner Extension <br />Final Report <br />Quality Assurance Monitoring & Test Results <br />February 4, 2014 <br />7.0 CONCLUSIONS <br />M lb <br />In accordance with our responsibilities as the Project Engineer and as the Quality <br />Assurance Consultant for construction of the PSES Pipe Rack Liner Extension, and <br />per the requirements of the various applicable DBMS approvals, AMEC attests that it <br />observed and performed the required CQA activities during construction of the PSES <br />Pipe Rack Liner Extension. Based on daily communications with AMEC personnel, <br />observations made during on site visits, and review of the laboratory and field test <br />results, AMEC attests that the PSES Pipe Rack Liner Extension was constructed in <br />compliance with the design plans and specifications as described in this document. <br />Sincerely, <br />AMEC Environment and Infrastructure, Inc. <br />Thorne M. Clark <br />Project Resident <br />Michael E. Nelson, PE <br />Certifying Engineer/ Project Manager <br />alm /ALM <br />18 <br />