My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> 3. A detailed list of performance criteria for the geosynthetic material being produced for this <br /> project. (Note: Performance criteria are sometimes referred to as "minimum property <br /> values." Refer to Part 2 of this Section for geotextile properties and test methods.) <br /> 1.03 QUALITY ASSURANCE <br /> A. All Work shall be constructed, monitored, and tested in compliance with requirements in the <br /> Construction Quality Assurance Plan (Section 01400.2). CONTRACTOR and <br /> MANUFACTURER shall participate and comply with all items in these SPECIFICATIONS and <br /> requirements of the CQA plan. <br /> B. CONTRACTOR shall ensure that geotextile MANUFACTURER has an internal product quality <br /> control program that meets Contract requirements. <br /> C. CONTRACTOR shall be aware of all activities outlined in the Construction Quality Assurance <br /> Plan,and the CONTRACTOR shall account for these activities in the construction schedule. <br /> D. CONTRACTOR shall assure that the geotextile is delivered to the site at least 14 calendar days <br /> prior to installation to allow sufficient time for conformance testing,if necessary. <br /> E. Geotextile rolls that do not meet the requirements of this SPECIFICATION will be rejected. <br /> CONTRACTOR will be required to replace the rejected material with new material that complies <br /> with the SPECIFICATIONS,at no additional cost to CC&V. <br /> F. In order to prevent weather-damaged geotextile from being placed,the following Quality Assurance <br /> procedures shall be followed: <br /> 1. CONTRACTOR shall perform its Work and utilize sufficient ballast as necessary to <br /> prevent wind uplift of the geotextile panels. <br /> 2. If weather damage should occur, CERTIFYING ENGINEER shall determine if the <br /> geotextile shall be repaired or replaced. Weather damage to the geotextile will include tears <br /> and dirty fabric,as determined by the CERTIFYING ENGINEER. <br /> 3. Repair or replacement of the weather-damaged geotextile shall be completed by <br /> CONTRACTOR at no additional cost to CC&V. <br /> 4. As determined by MANAGER and CERTIFYING ENGINEER, the geotextile panel <br /> may be rejected at no cost to CC&V. <br /> 1.04 DELIVERY,STORAGE,AND HANDLING <br /> A. Packing and Shipping <br /> 1. Geotextile shall be supplied in rolls wrapped in relatively impermeable and opaque <br /> protective covers,with straps for unloading. <br /> 2. Geotextile rolls shall be marked or tagged with the following information. <br /> a. MANUFACTURER's name <br /> b. Product information <br /> Section 02777 Page 2 of 5 May 9,2012 <br /> Geotextile Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.