My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> B. Prior to shipment,the GCL MANUFACTURER shall label each roll,identifying: <br /> 1. Product identification information(MANUFACTURER's name and address,brand product <br /> code). <br /> 2. Lot number and roll number. <br /> 3. Roll length,width and weight. <br /> 2.03 PACKAGING <br /> A. The GCL shall be wound around a rigid core whose diameter is sufficient to facilitate handling. The <br /> core is not necessarily intended to support the roll for lifting but should be sufficiently strong to <br /> prevent collapse during transit. <br /> B. All rolls shall be labeled and bagged in packaging that is resistant to photo degradation by ultraviolet <br /> (UV)light. <br /> 2.04 ACCESSORY BENTONITE <br /> A. The granular bentonite sealing clay used for overlap seaming,penetration sealing and repairs shall be <br /> made from the same natural sodium bentonite as used in the GCL and shall be as recommended by <br /> the GCL MANUFACTURER. Seaming of GCLs shall be conducted in accordance with the <br /> MANUFACTURER's guidelines. <br /> PART 3: EXECUTION <br /> 3.01 SHIPPING AND HANDLING <br /> A. The MANUFACTURER assumes responsibility for initial loading of the GCL. Unloading, on-site <br /> handling and storage of the GCL are the responsibility of the CONTRACTOR, INSTALLER or <br /> other designated party. <br /> B. A visual inspection of each roll should be made during unloading to identify if any packaging has <br /> been damaged. Rolls with damaged packaging should be marked and set aside for further inspection. <br /> The packaging should be repaired prior to being placed in storage. <br /> C. The party responsible for unloading the GCL should contact the MANUFACTURER prior to <br /> shipment to ascertain the appropriateness of the proposed unloading methods and equipment. <br /> 3.02 STORAGE <br /> A. Storage of the GCL rolls shall be the responsibility of the INSTALLER. A dedicated storage area <br /> shall be selected at the job site that is away from high traffic areas and is level,dry and well drained. <br /> B. Rolls should be stored in a manner that prevents sliding or rolling from the stacks and may be <br /> accomplished by the use of chock blocks. Rolls should be stacked at a height no higher than that at <br /> which the lifting apparatus can be safely handled(typically no higher than four). <br /> C. All stored GCL materials and the accessory bentonite must be covered with a plastic sheet or <br /> tarpaulin until their installation. <br /> D. The integrity and legibility of the labels shall be preserved during storage. <br /> Section 02776.2 Page 4 of 7 May 9,2012 <br /> Geosynthetic Clay Liner(GCL) Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.