My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - M1980244 (8)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2014-02-07_REPORT - M1980244 (8)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/4/2020 4:33:08 AM
Creation date
2/11/2014 12:55:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 2 of 2 document 1 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
367
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br /> SECTION 01400.1 EARTHWORKS CONSTRUCTION QUALITY ASSURANCE(CQA)PLAN <br /> PART 1: INTRODUCTION <br /> This plan addresses the construction quality assurance(CQA)procedures for the installation of the earthworks <br /> (soils) components of the Mill Site Earthworks Project, Teller County, Colorado. This program has been <br /> developed to assure that the construction of the soil components are in compliance with the project <br /> SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are achieved. <br /> The objective of this plan is to assure that proper materials, construction techniques, and procedures are <br /> followed by the CONTRACTOR and that the intent of the design is met. This plan also provides the means <br /> for resolution of problems that may occur during construction. <br /> This plan addresses quality assurance, not quality control. This CQA Plan is independent of the quality <br /> control (QC) programs conducted by CONTRACTOR. The intent of the CQA Plan is to provide <br /> independent third party verification and testing, to demonstrate that the CONTRACTOR has met its <br /> obligations in the supply and installation of earthwork (soils) materials according to the design, project <br /> SPECIFICATIONS, contractual, and regulatory requirements. Quality control is provided by <br /> CONTRACTOR and refers to those actions taken by the CONTRACTOR to ensure that materials and <br /> workmanship meet the requirements of the DRAWINGS and SPECIFICATIONS. <br /> PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION OUALITY ASSURANCE <br /> The following section provides descriptions of the parties to this CQA Plan including their responsibilities and <br /> qualifications. <br /> 2.01 CC&V: <br /> In this CQA Plan,CC&V refers specifically to Cripple Creek&Victor Gold Mining Company. CC&V owns <br /> and operates the site and mill. <br /> 2.02 MANAGER: <br /> In this CQA Plan,MANAGER refers to the individual appointed by the Cripple Creek&Victor Gold Mining <br /> Company. MANAGER is the official representative of CC&V and is responsible for all construction <br /> activities including oversight and direction during construction. MANAGER is also responsible for <br /> coordinating construction and CQA activities for the project. <br /> MANAGER shall serve as communications coordinator for the project, initiating preconstruction and <br /> resolution meetings. As communications coordinator,MANAGER will serve as a liaison between all parties <br /> involved in the project to ensure that ongoing communications are maintained. MANAGER and <br /> CERTIFYING ENGINEER shall be responsible for the resolution of all CQA issues. <br /> Duties for this position include the following: <br /> ■ review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the <br /> mill site earthworks; <br /> ■ preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br /> performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the <br /> CQA Plan can be implemented; <br /> Section 01400.1 Page 1 of 10 May 9,2012 <br /> Earthworks CQA Plan Revision 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.