Laserfiche WebLink
ameO <br /> 7.06 CONSTRUCTION CERTIFICATION REPORT: <br /> At the completion of the project,the CQA Monitor shall submit to MANAGER a Construction Certification <br /> Report. This report shall certify that the work has been performed in compliance with the DRAWINGS and <br /> SPECIFICATIONS and will contain the following information: <br /> ■ summary of all construction activities; <br /> ■ photographic documentation; <br /> ■ test data sheets; <br /> ■ copies of weekly reports; <br /> ■ CQA test results,including date,test locations and resolutions of deficient test results; <br /> ■ copies of surveyors certificate; <br /> ■ fill temperature monitoring results; <br /> ■ staff schedule summary; <br /> ■ a description of significant construction problems and the resolution of these problems; <br /> ■ changes to the DRAWINGS or SPECIFICATIONS and the justification for these changes; <br /> ■ record drawings,and <br /> ■ a statement certifying that construction was completed in compliance with the DRAWINGS <br /> and SPECIFICATIONS, signed, and sealed by the CERTIFYING ENGINEER registered in <br /> the State of Colorado. <br /> Section 01400.1 Page 8 of 10 May 9,2012 <br /> Earthworks CQA Plan Revision 1 <br />