Laserfiche WebLink
Snowcap Coal Company, Inc. <br />-12- 2013 Annual Reclamation Report <br />seeded. Approximately 0.1 acre was re- disturbed and re- seeded <br />during the reclamation of Ponds 6 & 10. The disturbed acres <br />associated with the previously approved realignment of Coal Creek, <br />approximately 0.8 acres, were approved as permanent features on <br />August 12, 2012 with PR -5. Located in the SE' /, Section 28, T1 OS, <br />R98W, 6th P.M. <br />Area — 2.4 acres <br />0.1 acres (re- disturbed) <br />Date — October 2012 <br />Seed Mix - "Seed Mix, Table 14 -8 ", Upland Components <br />2. Vegetation Studies - Field work for vegetation study was performed by <br />Cedar Creek Associates on May 28, 2013. Sampling was conducted at <br />two (2) areas that required "Year 4" vegetation cover evaluation. These <br />areas are described as the CRDA #1 Road and the G Substation. A copy <br />of the "Snowcap Coal Company, Revegetation Monitoring Evaluation - <br />2013" report is enclosed. <br />