My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - m1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
2014-02-07_REPORT - m1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:04:10 AM
Creation date
2/11/2014 11:49:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 1 of 2 document 3 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MWIT're X <br />used to place small lifts of overburden fill into the working and bucket tamp the material. This was <br />performed due the working being too narrow for the CAT 563 vibratory smooth drum compactor to <br />be used for compaction. <br />The crown pillar at Underground Working #4074 was removed using a CAT 330 excavator and <br />observation was performed by an AMEC field representative. The working was completely <br />removed during excavation and competent rock was encountered. A CAT 330 excavator was <br />used to place small lifts of overburden fill into the working and bucket tamp the material. This was <br />performed due the working being too narrow for the CAT 563 vibratory smooth drum compactor to <br />be used for compaction. <br />III) Geosynthetics <br />A) Geomembrane Delivery <br />No work performed during the week. <br />B) Geomembrane Installation <br />No work performed during the week. <br />C) Anchor Trench <br />No work performed during the week. <br />D) Geomembrane Exposure <br />No work performed during the week. <br />E) Geomembrane Acceptance <br />No work performed during the week. <br />IV)Storm Water Management <br />A) Best Management Practices (BMP) <br />Best Management Practices are being observed throughout the Mill Site Earthworks project. Silt <br />fence was placed at the toe of the Mill Site footprint and the toe of the Topsoil stockpile. <br />CQA ACTIVITIES: <br />SUMMARY: <br />The CQA activities performed consisted of observing, documenting and recording the construction <br />activities of the contractor. <br />AMEC observed subgrade preparation within the Mill Site Earthworks project prior to overburden fill <br />placement. Subgrade temperatures were monitored prior to fill placement. <br />AMEC observed excavation and placement of overburden fill within the Mill Site Earthworks project. <br />Ambient, existing, and placed fill temperatures were monitored throughout the week. <br />AMEC observed slope contouring of placed overburden fill for the Mill Site Earthworks project. <br />AMEC observed remediation of UG#4007. <br />AMEC observed remediation of UG#4073. <br />MEW Weekly Report WE 07.14.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.