My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-02-07_REPORT - m1980244
DRMS
>
Day Forward
>
Report
>
Minerals
>
2014-02-07_REPORT - m1980244
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2021 11:04:10 AM
Creation date
2/11/2014 11:49:23 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
m1980244
IBM Index Class Name
Report
Doc Date
2/7/2014
Doc Name
Final Report QA Monitoring and testing volume 1 of 2 document 3 of 3Mill Site Earth works
From
CC&V
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
212
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ameO <br />necessary) and compacted using a 10 -ton vibratory smooth drum compactor, passing over the <br />entire fill surface at least 4 times (method compaction technique was applicable). <br />Removal of previously placed overburden fill was performed to allow for the Mill platform /Phase IV <br />geomembrane tie -in. This was performed using CAT 40 -ton articulating haul trucks loaded by a <br />John Deere 850 excavator. <br />C) Slope Contouring <br />Slope contouring was performed using a John Deere 850 excavator and various CAT dozers. <br />Material generated during slope contouring was placed as overburden fill at the top of the slope. <br />D) Soil Liner Fill (SLF) <br />Processing of Soil Liner Fill material continued at the East Cresson Clay Processing area. A CAT <br />D -8 dozer, a Hitachi 200 excavator, and a CAT 980 front -end loader were used to process the <br />material. The processed material was hauled from the East Cresson Clay Processing area to a <br />temporary stockpile designated by CC &V. <br />SLF from the S. Cresson (Shop) Clay Borrow and Squaw (Dump 4) Clay stockpile was hauled to <br />a stockpile location designated by CC &V. This was performed using CAT 40 -ton articulating and <br />CAT 777 haul trucks loaded by a CAT 992 and CAT 988 front -end loader. <br />Location <br />This Week <br />Cumulative <br />Comments <br />(tons) <br />(tons) <br />E.Cresson Clay Process <br />5,114 <br />47,740 <br />DCF processing is temporarily paused <br />Total <br />5,114 <br />47,740 <br />DCF processing is temporarily paused <br />E) Drain Cover Fill (DCF) <br />No work performed during the week. <br />Location <br />This Week <br />Cumulative <br />Comments <br />tons <br />tons <br />DCF Process <br />- <br />158,613 <br />DCF processing is temporarily paused <br />Total <br />- <br />158,613 <br />DCF processing is temporarily paused <br />F) Miscellaneous <br />No work performed during the week. <br />II) Underground Mine Workings <br />A) Discovery <br />No work performed during the week. <br />B) Drilling <br />No work performed during the week. <br />C) Remediation <br />The crown pillar at Underground Working #4092 was removed using a CAT 330 excavator and <br />observation was performed by an AMEC field representative. The working was completely <br />removed during excavation and competent rock was encountered. A CAT 330 excavator was <br />MEW Weekly Report WE 07.28.2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.