Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Mill Site Earthworks Project <br />Final Report ameO <br />Quality Assurance Monitoring &Test Results <br />January 31, 2014 <br />7.0 CONCLUSIONS <br />In accordance with our responsibilities as the Project Engineer and as the Quality <br />Assurance Consultant for construction of the Mill Site Earthworks Project, and per the <br />requirements of the various applicable DRMS approvals, AMEC attests that it <br />observed and performed the required CQA activities during construction of the Mill Site <br />Earthworks Project. Based on daily communications with AMEC personnel, <br />observations made during on site visits, and review of the laboratory and field test <br />results, AMEC attests that the Mill Site Earthworks Project was constructed in <br />compliance with the design plans and Project Specifications as described in this <br />document. <br />Sincerely, <br />AMEC Environment & Infrastructure, Inc. <br />Joseph D. Hickey <br />Project Resident (October 2011 through November 2012) <br />Thorne Clark <br />Project Resident (November 2012 through December 2012) <br />Jay Janney- Moore, PE <br />Project Manager <br />Michael E. Nelson, PE <br />Certifying Engineer <br />acw /jdh /jnm /alm /MEN <br />28 <br />